My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/15/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
07/15/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2021 9:44:40 AM
Creation date
11/12/2020 1:54:31 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
07/15/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-I& Building Division <br />The proposed budget is $5,233,771, reflecting an increase of $191,778 or 3.8%. <br />Uncertainty regarding building activity remains a concern as we continue to navigate the COVID-19 <br />pandemic. Although permit activity has remained relatively strong, staff will continue to monitor <br />building activity levels and make mid -year adjustments to the budget if necessary. <br />One concern noted in recent years is the ability to recruit additional Building Inspector and Plans <br />Examiner positions. That recruitment issue is a common problem statewide and in growing areas <br />nationally. We have successfully used contracted inspectors to keep daily inspections per inspector <br />down to a manageable level and will continue working to improve customer service through reduced <br />inspector loads. The FY 2020/21 budget includes $850,000 for this contracted expense. Utilizing <br />contracted inspectors also helps preserve Building Division positions in the event of an economic <br />downturn, as contracted labor services will be eliminated before permanent positions. <br />Utilities <br />The Department of Utility Services recommended budget is $47,586,827, reflecting a decrease of <br />$2,591,414 or 5.2% (page 51). <br />Shue to the ever-increasing environmental compliance issues, more stringent Department of <br />Environmental Protection mandates and an extensive capital projects and deferred maintenance <br />program, the Department of Utility Services' budget includes the addition of one (1) full-time Assistant <br />Director position for a total cost of $127,656. <br />As recommended in the Comprehensive Water, Wastewater, and Reclaimed Water Rate Study, an <br />annual CPI adjustment is being recommended for the upcoming fiscal year. The CPI proposed is 1.5% <br />and is expected to generate approximately $500,000 in additional revenue. It is anticipated that these <br />increases will be needed on an annual basis going forward. <br />Funding to address deferred capital and maintenance projects is included in the FY 2020/21 budget <br />for a total of $4,421,400. This is the second year of a five-year plan for the Department of Utility <br />Services to catch up on deferred capital and 'maintenance projects that went unfunded during <br />the economic downturn. It is anticipated that $4,701,600 in deferred capital and maintenance will be, <br />expended in the current fiscal year, which was year one of the five-year plan. Over the five-year period, <br />the Department of Utility Services plan to spend approximately .$22 million to address these deferred <br />items in aIcontinued effort to improve the Utility's infrastructure. <br />• <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.