My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/2020
CBCC
>
Meetings
>
2020's
>
2020
>
10/06/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 10:48:01 AM
Creation date
11/16/2020 2:36:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/06/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT #A <br />South Oslo Rd Water Treatment Plant Improvements <br />Amendment No. 1 to Work Order No. 1 <br />PROJECT UNDERSTANDING <br />Kimley-Horn and Associates, Inc. was authorized under Work Order #1 to provide design, <br />permitting, and bidding phase services on December 17, 2019. Following completion of <br />task 1 of this scope including the preliminary evaluation, the following additional items <br />were determined to be necessary improvements as part of the overall p oject; <br />• New high service pumps (HSP) 4 & 5 (2 - 3 dwgs) ( \` <br />• Reverse Osmosis (RO) permeate and concentrate,lines (4 dwg <br />• HSP Suction and tank outlet piping (4 dwgsVy <br />• Additional CO2 storage and feed systemr(3:dwgs) <br />• Additional Sulfuric Acid pump skid (14wwg)� <br />• Additional bulk caustic tank in existing con tainment(2 dwgs) <br />• Uprating of the WTP from 8.5.7 to 9.0 MGD treatment capacity <br />• Modification to existing Demineralization Concentrat\e\(DC) disposal permit <br />• Separation of SCADA & PLC Improvements to stan&lo/en project <br />Consultant will <br />improvements 1 <br />Task 1— <br />Task <br />ide design; <br />Scope <br />phase services for the <br />Consultant will prepare design drawings and specifications for two additional high service <br />pumps, including supply and discharge piping as outlined in the preliminary design report <br />and 60% submittal. The design will consist of two new vertical turbine pumps located <br />outdoors of the existmg,building due to limited indoor space. The pumps will be designed <br />to match the existingpuinp performance and include variable frequency drives (VFDs) on <br />each of the pumps. The design will also consist of redundant suction and discharge piping <br />and incorporate dual distribution flow meters as described in the previous scope of <br />services. <br />Consultant will prepare design drawings for a new dual permeate pipe and replacement <br />concentrate pipeline. The dual permeate pipe will allow phasing of the RO train <br />installation and provide additional hydraulic capacity to the RO system to provide 9.0 <br />MGD. The additional concentrate line is necessary as a replacement to the existing <br />fiberglass reinforced plastic (FRP) pipe concentrate line that is susceptible to failures. <br />Both pipelines will be <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.