My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/2020
CBCC
>
Meetings
>
2020's
>
2020
>
10/06/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 10:48:01 AM
Creation date
11/16/2020 2:36:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/06/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary <br />construction easements, and centerline of construction. Horizontal control points with <br />state plane coordinates for all PC's, PT's, curve radius, curve length and horizontal Pi's <br />shall be included on the Plan or summarized in an alignment table. <br />3.- Signing and Pavement Markings will be included within the Construction Documents. <br />All signing and pavement markings are to be prepared in accordance with the latest <br />design standards and practices (MUTCD), FDOT Standard Specifications, Indexes, and <br />COUNTY standards. <br />4. Plans shall include spot grades adequate to describe any proposed grading. <br />5. Match lines shall not be located within the limits of an intersection. <br />6. If applicable, soil boring information shall be plotted on cross sections with soil <br />classification and high season water table. <br />7. All quantities shall reference FDOT Pay Item Numbers. <br />8. All details shall reference FDOT Index Numbers, where applicable. <br />9. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction. Any deviations or. special specifications not included in FDOT <br />Specifications will be provided in the Technical Specifications. <br />10. Initial (40% completion), interim (80% completion) and Final Plan (100% completion) <br />Submittal shall include the following: <br />L Three (3) Sets Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />The Consultant will be responsible for producing an opinion of probable cost (OPC) estimate <br />and reviewing and updating the OPC when scope changes occur and/or at designated <br />milestones of the project. A Summary of Pay Items sheet shall be prepared with all required <br />Initial (40%), Interim (80%) and Final Plan (100%) submittals. The Final Plans will be provided <br />signed and sealed. The plans will be prepared based upon English units. The design will be <br />conducted in MicroStation and Geopak. The Final Plans will be provided in Autodesk Civil 3D <br />format. <br />C. SijzninR and Pavement Markine Plans: <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, key map, <br />quantities (including signing and pavement marking quantity), tabulation of quantities, and <br />detail of major signs. Plans are to be prepared in accordance with the latest design standards <br />and practices (MUTCD), FDOT Standard Specifications, Indexes, and shall be accurate, legible, <br />complete in design and drawn at the same scale as the Roadway Plans, furnished in reproducible <br />form. <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.