My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2020
CBCC
>
Meetings
>
2020's
>
2020
>
10/13/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 3:10:12 PM
Creation date
11/16/2020 3:00:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/13/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 acres is comprised of Cell 1 C&D debris disposal facility, and 2.5 acres consists of a C&D <br />debris recycling facility. <br />The Class I landfill currently accepts both Class I waste and C&D debris for disposal under the <br />Florida Department of Environmental Protection (FDEP) Construct and Operate Permit <br />Modification Nos. 0128769 -026 -SC -IM and 0128769 -027 -SO -MM, dated April 2, 2018 (Class I <br />Permit). The C&D debris disposal facility operates under FDEP Permit No. 0128769 -025 -SO - <br />24, dated July 13, 2017 (C&D Permit). <br />The Water Quality Monitoring Plan (WQMP) for each of the IRCL facilities permits (which is <br />listed as Appendix 3 of each permit) indicates that groundwater and surface water quality <br />monitoring are required. Semi-annual sampling of the Class I landfill and C&D debris disposal <br />facility groundwater monitoring wells shall be conducted in January and July 2020. The samples <br />collected from the Class I landfill and C&D debris disposal facility monitoring wells shall be <br />analyzed for the routine monitoring parameters listed in Section 11.3 (Class I Permit) and <br />Paragraph 8 (C&D Permit) of the WQMP, respectively, as required by paragraphs 62- <br />701.510(5)(c) & (7)(a) and 62-701.730(8)(d), Florida Administrative Code (F.A.C.). Samples <br />from one surface water monitoring site (SW -2) shall be collected semi-annually in January and <br />July, if water is discharging from the stormwater pond. The samples, if collected, shall be <br />analyzed for the list of parameters listed in Section I11.2 of the Class I Landfill WQMP, as <br />required by paragraphs 62-701.510 (5)(d) and (7)(b), F.A.C. <br />Semi -Annual Water Quality Compliance Monitoring for the Class I Landfill <br />A comment letter from FDEP dated 6 May 2020 provided comments regarding the results of the <br />January 2020 Semi -Annual Water Quality Monitoring Report for the Class I landfill. The FDEP <br />provided notification to SWDD to initiate evaluation monitoring at all monitoring wells with <br />detected exceedances above applicable groundwater cleanup target levels (GCTLs) for pH, <br />ammonia, chloride, sodium, TDS and arsenic. Geosyntec provided a response to comments <br />(RTC) letter the FDEP comment letter on 28 May 2020 which focused on the long-term trends <br />with the dataset available from the FDEP Water Assurance Compliance System (WACS) <br />database and requested a reduction of evaluation monitoring locations from 25 locations (as <br />originally requested by the FDEP in the 8 May 2020 letter) to 4 locations (specifically <br />downgradient of MW -3S, MW -145, MW -44S and MW -44I). The FDEP approved this request <br />in a letter dated 14 August 2020 and the 90 -day evaluation monitoring period was initiated on 17 <br />September 2020 through a second RTC letter provided to FDEP. <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.