My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2020
CBCC
>
Meetings
>
2020's
>
2020
>
10/13/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 3:10:12 PM
Creation date
11/16/2020 3:00:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/13/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tree Well systems are engineered phytoremediation plantings designed to aggressively draw <br />groundwater from the saturated zone, thereby increasing groundwater extraction rates and <br />meaningfully controlling the flow dynamics of an aquifer. It is an active remedial system that <br />operates in a passive manner, with no external energy requirement, resulting in significantly <br />reduced operation and maintenance (O&M) costs. Geosyntec has the experience to design and <br />implement these systems and is licensed to provide Tree Well units to our clients. We have <br />successfully implemented these systems in Florida and across North America. <br />PROPOSED SCOPE OF SERVICES <br />The proposed scope of services includes activities to be performed on behalf of SWDD for the <br />evaluation monitoring downgradient of the four wells for the Class I landfill and supplemental <br />groundwater assessment at the C&D debris disposal facility. For the purpose of budgeting, the <br />scope of work has been divided into the following four (4) main phases: <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Database Preparation; <br />• Phase 3 — C&D Debris Disposal Facility Supplemental Groundwater Assessment; and <br />• Phase 4 — Class I Landfill Evaluation Monitoring. <br />The above scope of services is based on current regulations and reporting requirements for the <br />IRCL facility as previously discussed above. An amendment to this scope of services may be <br />needed should there be any regulatory changes that result in additional work. The remainder of <br />this section presents a general description of the activities to be performed in each phase. <br />Phase 1— General Consulting/Meeting Support/Project Management <br />Under this phase, Geosyntec will perform project planning and management responsibilities, <br />such as correspondence with SWDD and FDEP, invoice review, project coordination, prepare a <br />site-specific Health and Safety Plan, preparation of a work plan for FDEP approval for the tasks <br />outlined in Phase 3 of this proposal and project administration. Geosyntec has also included <br />budget for preparation and attendance (by three Geosyntec personnel) at two meetings with <br />SWDD and/or FDEP, as needed. <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.