My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2020
CBCC
>
Meetings
>
2020's
>
2020
>
10/13/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 3:10:12 PM
Creation date
11/16/2020 3:00:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/13/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
application of engineered phytoremediation techniques as a potential remedial approach. The <br />temporary piezometers will be constructed of 2 -inch (in.) schedule (SCH) 40 poly -vinyl chloride <br />(PVC) well materials including a 10 -slot (0.001 -in.) screen including a 20/30 graded silica sand <br />filter pack, 30/65 graded silica sand seal and cement grout slurry to surface. The completion <br />interval of the temporary piezometers will be based upon the groundwater screening results. <br />Each temporary piezometer will be completed with an above ground protective casing and three <br />steel bollards. Each temporary piezometer will be developed for a period of one hour either prior <br />to grouting or at least 24 hours after grouting. Slug testing will be completed at each of the three <br />(3) new temporary piezometers to estimate the aquifer permeability which is needed to evaluate <br />the groundwater velocity to assess remedial alternatives including groundwater extraction via <br />Tree Well phytoremediation technology. <br />A single round of groundwater samples will be collected from each of the three (3) new <br />temporary piezometers for the parameters as required by paragraphs 62-701.510(5)(a) and (c), <br />F.A.C., and will also include TN and TP. Additionally, a groundwater sample from each <br />temporary piezometer will be submitted to ServiTech for analysis of select groundwater <br />agronomic test parameters to evaluate the feasibility of the application of engineered <br />phytoremediation techniques as a potential remedial approach. The intention is to collect the <br />temporary piezometer groundwater samples during the October 2020 quarterly C&D debris <br />disposal facility assessment monitoring event. Any subsequent sampling at the three (3) <br />temporary piezometers will be included in a subsequent proposal for the 2021 water -quality <br />compliance monitoring program. <br />The result of the supplement groundwater assessment will be summarized in a technical <br />memorandum which will include: <br />1. Summary of field methods; <br />2. Summary of field and analytical laboratory results; <br />3. Evaluation of remedial options including feasibility of groundwater extraction via <br />Tree Well phytoremediation technology; and <br />4. Recommendation for path forward for remediation. <br />Geosyntec will oversee the DPT groundwater screening and HSA soil sampling and temporary <br />piezometer installation. The subcontracted driller will be JAEE of Davie, Florida. Geosyntec <br />2 Groundwater agronomic parameters to be analyzed by ServiTech will include: nitrate -nitrogen, chloride, sulfate - <br />sulfur, carbonate, bicarbonate, calcium, magnesium, sodium, potassium, boron, total hardness, total dissolved solids, <br />alkalinity, electrical conductivity, sodium adsorption ratio (SAR), adjusted SAR (SARa), sodium, % of cations, <br />water pH, pHc, nutrients in lb/acre-foot, potassium as K20, ammonia, phosphorus as P205, total nitrogen (Calc), <br />total phosphorus, total Kjeldahl nitrogen. <br />79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.