Laserfiche WebLink
MVI BV <br />ENGINEERING, INC. <br />MOIA BOWLES VILLAMIZAR & ASSOCIATES <br />www.mbveng.com CA #3728 <br />REVISED EXHIBIT C <br />ESTIMATE OF CONSTRUCTION COST <br />Vero Beach MOB Forcemain Cost - Direction Drill - Shared Costs <br />Bid Item Estimated <br />No. I Bid Item Description Quantity Unit Unit Price I Total Price <br />1 JORIGINAL DEVELOPER'S AGREEMENT (IEZCD1'S share) (Exhibit C) <br />1 <br />EA <br />$ <br />6,416.51 <br />$ <br />6,416.51 <br />2 6" PVC (DR 18) (Cost dift'erence for the u )sized PVC) (F"xbibit C) <br />-475 <br />LF <br />$ <br />5.70 <br />$ <br />(2,707.50) <br />3 4" HDD inc HDPE, Fusing, & Bentonite Removal (Develo >er Rec wired) <br />-475 <br />LF <br />$ <br />25.50 <br />$ <br />(12,112.50 <br />4 6" HDD inc HDPE, Fusing, & Bentonite Removal i County Requested) <br />475 <br />LF <br />$ <br />31.50 <br />$ <br />14 962.50 <br />1 - Total cost differential to upsize to 6" HDD <br />$ <br />6,559.01 <br />... <.... <br />2 ';6 -IN °' ' : �� �� C�un tt�sted � <br />1 6" x 4" Tee <br />`� �' 7'7" <br />1 EA $ 560.00 <br />$ <br />560.00- <br />2 4" Gate Valve w/ blind flange <br />1 EA $ 1,100.00 <br />$ <br />11100.00 <br />3 4" Cap <br />EA $ 150.00 <br />$ <br />150.00 <br />2 - Total County -requested items <br />$ <br />1,810.00 <br />No. 55313 <br />so OF 'W= <br />Aaron Bowles, P.E.tOROP'-('� <br />NA'-Iv?�\\� <br />�//1111111\\� <br />1 - Total cost differential to upsize to 6" HDD $ 6,559.01 <br />2 - Total County -requested items $ 1,810.00 <br />Total shared cost to County $ 8 369.01 <br />11 2 2020 <br />FL PE# 55313 Date <br />1835 20th Street 1250 W. Eau Gallie Blvd., Suite H 806 Delaware Avenue <br />Vero Beach, FL 32960 Melbourne, FL 32935 Ft. Pierce, FL 34950 <br />772.569.0035 321.253.15 10 772.468.9055 <br />Fax: 772.778.3617 Fax: 321.253.091 1 Fax: 772.778.3617 <br />901 Martin Downs Blvd., Suite 203 <br />Palm City, FL 34990 <br />772.426.9959 <br />Fax: 772.778.3617 <br />