My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-239
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:00:19 PM
Creation date
11/25/2020 11:50:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/17/2020
Control Number
2020-039
Agenda Item Number
8.E.
Entity Name
G.K. Environmental, Inc.
Subject
Work Order No. EM-1 for maintenance of invasive / exotic vegetation species
at Egret Marsh Stormwater Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />G. K. ENVIRONMENTAL, INC. <br />Environmental Consulting <br />GEORGE R. KULCZYCKI, CEC, CES, CEI <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone 772-567-9129 <br />Email gkena me.com <br />October 25, 2020 <br />Mr. Keith McCully, P.E. <br />Stormwater Engineer <br />Indian River County <br />1801 27th Street <br />Vero Beach, Florida 32960-3388 <br />RE: Professional Service Agreement for: <br />11.0 Ac. / Egret Marsh / 2 Lakes & Woodstork Island <br />GKE Bi -Monthly Maintenance / 22 events <br />Dear Keith, <br />This letter is in response to the requested proposal for the above <br />referenced project in Indian River County, Florida, for environmental services as <br />generally required for Industry Standards. G. K. Environmental, Inc. (GKE) will <br />be pleased to provide this scope of service under this contract, which is outlined <br />below: <br />TASK I <br />1.0 GKE to provide bi-monthly exotic vegetation control at Egret Marsh <br />(mowing not included) of the areas delineated in Attachment A. <br />1.1 Bi -monthly maintenance — 2 visits per month for 11 months / 22 <br />visits (November 2020—September 2021) with boat, spray bike, <br />backpacks, equipment, chemicals, and crew. <br />$3,500,00 per month (22 visits) over 11 months = $38,500.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.