My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-240
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:00:58 PM
Creation date
11/25/2020 11:51:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/17/2020
Control Number
2020-040
Agenda Item Number
8.F.
Entity Name
G.K. Environmental,Inc.
Subject
Work Order No. OA-1 for maintenance of invasive / exotic vegetation species
at Osprey Acres Floway Nature Preserve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />G. K. ENVIRONMENTAL, INC. <br />Environmental Consulting <br />GEORGE R. KULCLYCKI, CEC, CES, CEI <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone 772-567-9129 <br />Email <br />Mr. Keith McCully, P.E. November 3, 2020 <br />Stormwater Engineer <br />Indian River County <br />1801 27th Street <br />Vero Beach, Florida 32960-3388 <br />RE: GKE Professional Service Agreement for: <br />Osprey Acres — <br />Flow Way (Task I -A) <br />Shallow Marsh (Task I -B) <br />11 -Month Maintenance (2x's per month) of Invasive Species within <br />the Flow Way and the Shallow Marsh Area (November 15, 2020 — <br />September 31, 2021) <br />Dear Keith, <br />This letter is in response to the requested proposal for the above <br />referenced project in Indian River County, Florida, for environmental services as <br />generally required for Industry Standards and/or State and Federal <br />Environmental Resource / Individual Permits and Compliance. G. K. <br />Environmental, Inc. (GKE) will be pleased to provide this scope of service <br />under this contract, which is outlined below: <br />Flow Way - TASK I -A <br />1.0 GKE to provide: Onsite Maintenance / 11 Months (22 treatments) for <br />Invasive, Exotic Plant Control (November 2020 -September 31, 2021) <br />1.1 GKE will coordinate labor, herbicide, equipment, materials, and <br />incidentals necessary for the maintenance treatment. <br />1.2 Site will be visited twice each month with treatments as necessary <br />to control undesirable growth within the flow way, 3 trails, and <br />inside fence line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.