My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-241
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:01:19 PM
Creation date
11/25/2020 11:55:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/17/2020
Control Number
2020-241
Agenda Item Number
8.G.
Entity Name
Kimley Horn and Associates, Inc.
Subject
Work Order MM-1 for structural redesign
Moorhen Marsh Aquatic Plant System; Project IRC-1909
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NUMBER MM -1 <br />Moorhen Marsh Structural Services for Revised Facility Cast -In -Place Structures <br />Project Number: IRC -1909 <br />This Work Order Number MM -1 is entered into as of this 17th day of November, <br />2020, pursuant to that certain Continuing Consulting Engineering Services Agreement for <br />Professional Services entered into as of this 17th day of April, 2018 (collectively referred to as <br />the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State <br />of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />EXHIBIT A — SCOPE OF WORK <br />Moorhen Marsh Structural Services for Revised Facility Cast -in -Place Structures <br />The COUNTY is designing the Moorhen Marsh Leaps treatment facility in-house and has <br />requested structural design services for structures in the revised facility layout. The new facility <br />layout maintained the previous layout of the headworks structure. Structural services for the <br />headworks structure were completed under a previous work authorization. The requested <br />structural design services are limited to the preparation of construction drawings and <br />specifications for cast -in-place structures that were revised with the revised facility layout listed <br />below; <br />• Water Lettuce Scrubber Access Ramp Walls <br />• Water Lettuce Scrubber Sumps S-8 through S-15 <br />• Water Lettuce Scrubber Perimeter curb <br />• Solid Sludge Sump/Discharge Weir <br />• Discharge/Reoxygenation Flume <br />• Final Discharge Structure S1 <br />• Solids Holding Ingress/Egress Ramp <br />• Revised Headworks work slab <br />1IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.