Laserfiche WebLink
Work Order No. MM -1 <br />Moorhen Marsh Structural Services <br />for Revised Facility Cast -In -Place Structures <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to follow the below schedule from the Notice to Proceed (NTP). <br />NTP <br />contingent upon BOCC approval <br />Interim Submittal (90% Design Drawings) 6 weeks following NTP <br />Final Submittal (100% Design Drawings) 3 weeks following 90% comments <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />