My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-241
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 2:01:19 PM
Creation date
11/25/2020 11:55:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/17/2020
Control Number
2020-241
Agenda Item Number
8.G.
Entity Name
Kimley Horn and Associates, Inc.
Subject
Work Order MM-1 for structural redesign
Moorhen Marsh Aquatic Plant System; Project IRC-1909
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br />Moorhen Marsh Structural Services for Revised Facility Cast -in -Place Structures <br />PROPOSED STAFF HOURS AND FEE <br />TASK <br />TPRINCIPAL <br />SENIOR <br />SR SUPPORT <br />PROFESSIONAL <br />PROFESSIONAL2 <br />STAFF <br />TOTALHOURS <br />$240.00 <br />$175.00 <br />$125.00 <br />$75.00 <br />Task 1 - Structural Design Services <br />General Plans Sheets <br />Cover Sheet <br />4.0 <br />4.0 <br />General Site plan <br />8.0 <br />24.0 <br />32.0 <br />Water Lettuce Scrubber enlarged Site plan <br />1.0 <br />8.0 <br />24.0 <br />33.0 <br />Water Lettuce Scrubber Jointing Plan <br />1.0 <br />8.0 <br />24.0 <br />33.0 <br />Individual Structures Design and Details <br />Water Lettuce Scrubber Access Ramp Walls <br />6.0 <br />10.0 <br />16.0 <br />Water Lettuce Scrubber Sumps S-8 through S-15 <br />1.0 <br />6.0 <br />10.0 <br />17.0 <br />Water Lettuce Scrubber Perimeter curb <br />4.0 <br />8.0 <br />12.0 <br />Solid Sludge Sump <br />1.0 <br />12.0 <br />30.0 <br />43.0 <br />Discharge/Reoxygenation Flume <br />8.0 <br />16.0 <br />24.0 <br />Final Discharge Structure S1 <br />1.0 <br />14.0 <br />30.0 <br />45.0 <br />Solids Holding Ingress/Egress Ramp <br />6.0 <br />10.0 <br />16.0 <br />Revised headworks work slab <br />2.0 <br />4.0 <br />6.0 <br />$1,200.00 <br />$14,350.00 <br />S24,250.00 <br />50.00 <br />539,800.00 <br />Task 2 - Coordination and Meetings <br />Kickoff Meeting with County <br />1.0 <br />4.0 <br />5.0 <br />90% Coment Discussion Metting <br />1.0 <br />4.0 <br />5.0 <br />Miscellanous Coordination <br />2.0 <br />6.0 <br />$960.00 <br />$2,450.00 <br />$0.00 <br />$0.00 <br />$3,410.00 <br />Task 3 - Bid Phase Services <br />Prepare and Attend Prebid meeting <br />1.0 <br />4.0 <br />Respond to structural related bid questions <br />2.0 <br />11.0 <br />$720.00 <br />$2,625.00 <br />$0.00 <br />$0.00 <br />$3,345.00 <br />Subtotal <br />$46,555.00 <br />Total <br />$46,555.00 <br />TOTAL FEE NTE <br />$46,555.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.