Laserfiche WebLink
ENGINEERS COST ESTIMATE <br />FPL Indian River Service Center <br />Project Description: 98th Avenue and 16th Street Improvements <br />Date: 10/22/2020 <br />Pay Item <br />Eng I Inee Unit <br />Ind., n Rlwr County Fund <br />-Cost <br />Number <br />Payit Deucription <br />Quantity <br />Unit <br />" <br />Cost Engineers Subtotal Cost <br />Quantity Unit E.glneer�s Unit Cost Engineer's Subtotal Cost <br />Total Quantity <br />Total <br />Engineer', <br />iy - <br />101-1 <br />MOBILIZATION/ DEMOBILIZATION <br />LS <br />$ 10010M.00 1 $ <br />100,OM.OD <br />1 <br />$ <br />10010000 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />I <br />LS <br />$ 50,000.00 $ <br />50,000m <br />1 <br />$ <br />.0 <br />SO,0OU.00 <br />104-2 <br />PREVE NTION, CONTROL& ABATEMENT OF ER05ION AND WATER POLLUTION <br />I <br />LS <br />$ 15,000.00 $ <br />15,000.00 <br />108-1 <br />CONSTRUCTION LAYOUT/1 <br />LS <br />$ 15,000.00 $ <br />15,000.00 <br />1 <br />1 <br />15,000.00 <br />110.1-1 <br />CLEARING & GRUBBING <br />9.2 <br />AC <br />$ 13,000.00 $ <br />119,600.00 <br />9,2 <br />15,000.00120-1 <br />119,600.00 <br />REGULAR EXCAVATION <br />SZ02 <br />CY <br />$ 8.00 $ <br />41,616.00 <br />5202 <br />$ <br />120-6 <br />EMBANKMENT <br />4813 <br />CY$ <br />8.00 $ <br />38,504.00 <br />4813 <br />$ <br />41,616.00 <br />38,504.00 <br />1604 <br />TYPE "B" STABILIZATIONSTABILIZATION210-3 <br />14080 <br />SY <br />$ 3.50 $ <br />49,280.00 <br />$ <br />PULL DEPTH BASE RECLAMATION (DEPTH TBD) <br />SGO <br />SY <br />$ 3.00 $ <br />1,680.00 <br />- <br />8095 1 SY $ 3.001 $ 24,285.00 <br />14080 <br />8655 <br />$ <br />49,280.00 <br />25,965.00 <br />285-709 <br />CEMENTED COQUINA, OPTIONAL BASE GROUP 9 (10") <br />11725 <br />SY <br />$ 17.00, $ <br />199,325.00 <br />1 <br />11725 <br />5 <br />199,325.00 <br />334-1-13A <br />SUPERPAVE ASPHALT CONCRETE (SP -9.5) (TRAFFIC C)(1") <br />$04 <br />TN <br />$ 130.001 $ <br />104,520.00 <br />445 1 TN $ 130.00- $ 57,850.00 <br />1249 <br />$ <br />162,370,00 <br />334-1-1313 <br />_ SUPERPAVE ASPHALT CONCRETE SP -12.5) (TRAFFIC C) (1.5-) <br />1206 <br />TN <br />$ 130.00 $ <br />156,780.00 <br />668 TN - <br />$ 130.00 96,840.00 <br />1874 <br />243,620.00 <br />334-1-13C <br />_ SUPERPAVE ASPHALT CONCRETE (SP -12.5) (TRAFFIC C) (OVERBUILD) <br />$ <br />868 TN 112,840.00 <br />$ 130.00 <br />868 <br />$ <br />112,840.00 <br />4OG-1-2 <br />_ CLASS I CONCRETE (ENDWALL) <br />6.77 <br />CY <br />$ 1,280.00 $ <br />81665.60 <br />6.77 <br />$ <br />8,665.60 <br />425-1-523 <br />_ INLET (DBI) (TYPE C) (I -BOTTOM) J<0') <br />I <br />EA <br />$ 5,800.00 $ <br />5,800.00 <br />1 <br />$ <br />5,800.00 <br />425-1-541 <br />INLET (DBI) (TYPE 01 (,10') <br />12 <br />EA <br />$ 31500.00 $ <br />42,000.00 <br />12 <br />$ <br />42,000.00 <br />14254-551 <br />INLET JOBII (TYPE E) (,10'1 <br />1 <br />EA <br />$ 4,500.0D $ <br />4,500.00 <br />1 <br />4,500.00 <br />425-2-41 <br />MANHOLE (P-7) (<10') <br />1 <br />EA <br />$ 4,000.00 $ <br />4,000.00 <br />1 <br />4,000.00 <br />425-2-61 <br />MANHOLE (P-8) (< 10') <br />I <br />EA <br />4,000,00 $ <br />4,000.00 <br />1 <br />4,000.00 <br />425-6 <br />VALVE BOX (ADJUST) <br />8 <br />EA <br />450.00 5 <br />3,600.00 <br />8 <br />$ <br />3,600.00 <br />430.175-112 <br />CONCRETE PIPE CULVERT (12-1 (SICO) (CL 111) <br />162 <br />LF <br />40.00 $ <br />1!480 00 <br />162 <br />$ <br />6,480.00 <br />430-175m!18 <br />CONCRETE PIPE CULVERT (18") (S/CD) (CL 111) <br />892 <br />LF <br />$ SS -001 $ <br />49 060.00 <br />892 <br />$ <br />49,060.00 <br />43 0-175-1188 <br />CORRUGATED ALUMINUM PIPE CULVERT (1W) (S/CD) <br />60- <br />LF <br />$ 55.001 $ <br />3,300.00 <br />60 <br />$ <br />3,300.00 <br />430-175-124 <br />CONCRETE PIPE CULVERT (24-) (S/CD) (CL 111) <br />1334 <br />LF <br />60.GO <br />80,040.00 <br />1334 <br />80,040.00 <br />430.175-1248 <br />CORRUGATED ALUMINUM PIPE CULVERT (24") (S/CDJ <br />20 <br />UP <br />60.00 <br />1,200.00 <br />20 <br />1,200.00 <br />430.175-136 <br />_ CONCRETE PIPE CULVERT (36") (S/CD) (CL 111) <br />64 <br />LF <br />-$-80 00 $ <br />5,120.170 <br />64 <br />5,120.00 <br />430-175-1368 <br />CORRUGATED ALUMINUM PIPE CULVERT (36-1 (S/CD) <br />20 <br />LF <br />$ 80.00 <br />1,600.00 <br />20 <br />1,600.00 <br />430-982425 <br />MITERED END SECTION (ROUND) (18-) (CD) <br />3 <br />EA <br />$ 1,500.00 $ <br />4,500.00 <br />3 <br />4,500.00 <br />430-992429 <br />MITERED END SECTION (ROUND) (24-) (CD) <br />I <br />EA <br />$ 1,600.00 $ <br />1,600.00 <br />1- <br />$ <br />1,600,00 <br />520-1-7 <br />TYPE 'F" CURB & GUTTER <br />1435 <br />LF <br />$ 17.00 $ <br />24 395.00 <br />1435 <br />$ <br />24,395.00 <br />522-2 <br />CONCRETE SIDEWALKAND DRIVEWAYS (6- THICK) <br />1310 <br />SY <br />$ 52.00 $ <br />68,120.00 <br />1310 <br />$ <br />68,120.00 <br />527-2 <br />_ DETECTABLE WARNINGS <br />10 <br />SF <br />$ 28.00 $ <br />280.00 <br />10 <br />280.00 <br />530.3-4 <br />RIPRAP - RUBBLE (F&I) (DITCH LINING) <br />71 <br />TN <br />$ 84,00 $ <br />5,964.00 <br />71 <br />5,964.00 <br />538-1 <br />_ GUARDRAIL REMOVAL AND RESET <br />60 <br />LF <br />$ 13.00 $ <br />780.00 <br />60 <br />780.00 <br />570.1-1 <br />_ PERFORMANCE TURF (SOD) (BAHIA) <br />18300 <br />SY <br />$ 1.75 $ <br />32,02S.00 <br />18300 <br />$ <br />32,01500 <br />1644800 <br />_ FIRE HYDRANT (RELOCATE) <br />3 <br />EA <br />$ 3,423.00 $ <br />10,269.00 <br />3 <br />$ <br />10,269.00 <br />700-1-11 <br />SINGLE -POST SIGN (F&1) (- 12 SF) <br />35 <br />AS <br />$ 350.00 $ <br />12,250.00 <br />35 <br />$ <br />12,250.GO <br />706-3 <br />RETRO, REFLECTIVE MARKERS <br />294 <br />EA <br />$ 5.00 $ <br />1,470.00 <br />294 <br />$ <br />1,470.00 <br />711-11-121 <br />THERMOPLASTIC, STD, WHITE, SOLID, 6" <br />9800 <br />LF <br />$ 1.50 $ <br />14,700.00 <br />9800 <br />$ <br />14,700.00 <br />711-11-123 <br />_ THERMOPLASTIC, STO, WHITE, SOLID, 12- <br />225 <br />LF <br />$ 3.00 $ <br />675.00 <br />225_ <br />$ <br />67-500 <br />711-11-125 <br />THERMOPLASTIC, STO, WHITE, SOLID, 24" <br />250 <br />LF <br />$ 5.00 $ <br />1,250.00 <br />250 <br />1,250.00 <br />711-11-141 <br />_ THERMOPLASTIC, STD,WHITE, SKIP (2'-4'/6'-10),6^ <br />86 <br />LF <br />$ 1.50 $ <br />129.00 <br />86 <br />1.29.00 <br />711-11-160 <br />THERMOPLASTIC, STO, WHITE. MESSAGE <br />it <br />EA <br />$ 190,00 $ <br />2,090.00 <br />11 <br />2,09 .00 <br />711=11-170 <br />THERMOPLASTIC, STD, WHITE, ARROW <br />13 <br />EA <br />$ 75.00 $ <br />975.00 <br />13 <br />$ <br />975.00 <br />711-11-221 <br />THERMOPLASTIC, STD, YELLOW, SOLID, 6"SS00 <br />LF <br />1.50 $ <br />8,250.00$ <br />B,�50. <br />5500 <br />$ <br />8,250.00 <br />711-11-224 <br />THERMOPLASTIC, STD, YELLOW, SOLID, 18- <br />SO <br />IF <br />4. $ <br />200.00 <br />so <br />$ <br />200.00 <br />711-16-231 <br />THERMOPLASTIC, STD, YELLOW, SKIP (10'-30%6" <br />2725 <br />LF <br />$ 1.50 $ <br />4,087.501 <br />2725 <br />$ <br />4,087-501 <br />JASI-010 <br />ADD 3 NEW DRAINAGE CROSSINGS & SWALE AREA ALONG 98th AVE, <br />1 <br />1 1 LS 96,874.52 $ 96.874 57 <br />1 <br />$ <br />96,874.52 <br />Subtotal Subtotal Total <br />FPL Funds IRCf.nd, <br />