My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-249
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 10:25:32 AM
Creation date
12/9/2020 3:22:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
12/01/2020
Control Number
2020-249
Agenda Item Number
8.M.
Entity Name
SEE DOC 2021-070 FOR CORRECTED COPY (end date corrected)
Florida Department of Emergency Management
Subject
Federally Funded Subaward and Grant Agreement
Area
Jones' Pier Conservation Area Public Use Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />JR. SMITH, CLERK <br />each hour including enough information to calculate the hourly rates based on payroll records. <br />Employee benefits shall be clearly shown. <br />The .Division shall review all submitted requests for reimbursement for basic accuracy of information. <br />Further, the Division shall ensure that no unauthorized work was completed prior to the approved <br />project start date by verifying;vendor and contractor.invoices. The Division shall verify that reported <br />costs were,incurred in'the performance of eligible work, that the approved work was completed, and <br />thatthe mitigation measures are in compliance with the approved scope of work prior to processing <br />any requests for reimbursement <br />Review and approval of any third party in-kind services, if applicable, shall be conducted by the <br />Division in coordination with the Sub -Recipient Quarterly reports shall be submitted by the Sub - <br />Recipient and received by the Division at the times provided; in this agreement prior to the processing <br />of any reimbursement. <br />The:Sub=Recipientshall submit tothe.Division requests;forreimbursement of actual construction and <br />managerial costs%related to the project as identified, - n the project application, conceptual designs, <br />and construction plans. The requests for reimbursement shall include: <br />a) Contractor, subcontractor, and/or vendor invoices which clearly display dates of services <br />performed, description of services. performed, location of services performed, cost of services <br />performed,.name of service provider and any other, pertinent information; <br />b) Proof of payment from the Sub -Recipient to the contractor, subcontractor, and/or vendor for <br />invoiced services; <br />c) Clear identificationof amount of costs being requested for reimbursement as well as costs being <br />applied against the local match amount. <br />The Sub -Recipient's final, request for reimbursement shall include the final construction project cost. <br />Supportingdocumentation shall show that all contractors and subcontractors have been paid. <br />B) .. R@ ivembles:i. <br />Mitigation Activities consist of the elevation of a structure in Vero Beach, Florida, to include the <br />construction of a new foundation system consisting of concrete pads and piers to support the structure <br />and provide protection to a historic single family residence. <br />The project shall provide protection against a 100 -year storm event. Activities shall be completed in <br />strict compliance with Federal, State and Local applicable Rules and Regulations. <br />Provided Ahe Sub -Recipient performs in accordance with the Scope of Work outlined in this <br />Agreement; the Division shall reimburse the Sub -Recipient based on the percentage of overall <br />project completion. <br />,,PROJECT=CONDITIONS-AND REQUIREMENTS: <br />C) Engineering: <br />1) The Sub -Recipient shall submit to the Division an official letter stating that the project is 100% <br />complete and ready for the Division's Final Inspection. of the project. <br />2) TheSut�-Recipient shall provide.a copy of the Notice of Commencement, and a copy of the Certificate <br />of Occupancy or any locel offidial Inspection Report and/or Final Approval, as applicable. <br />3) The Sub -Recipient shall provide a copy of the Elevation Certificate prepared before mitigation, if <br />available. <br />4) The Sub -Recipient shallsubmit a copy of the Elevation Certificate prepared after mitigation, showing <br />the Base Flood Elevation and the elevation of all components. <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.