My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
11/15/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 1:10:04 PM
Creation date
12/10/2020 12:13:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />PUBLIC WORKS DEPARTMENT - TRAFFIC ENGINEERING DIVISION <br />INTER -OFFICE MEMORANDUM <br />DATE: November 2, 2016 <br />TO: Jason E. Brown, County Administrator <br />THROUGH: <br />Richard B. Szpyrka, P.E., Public Works <br />FROM: Kimberly Graham, P.E., County Traffic <br />SUBJECT: <br />Work Order No. 2, Carter Associates, Inc. <br />Intersection of 21' Street SW and 27th Avenue <br />Mast Arm Traffic Signal Design <br />DESCRIPTION AND CONDITIONS <br />On November 15, 2011, the Board of County Commissioners approved the Continuing Contract for <br />Professional Services with Carter Associates, Inc. and on November 4, 2014, approved an Extension <br />and Amendment of the Continuing Contract. <br />Based on a traffic signal warrant study at the .intersection of 21' Street SW at 27' Avenue the Traffic <br />Engineering Division (Traffic) recommends the installation of a mast arm traffic signal at the <br />intersection. Attached please find Work Order No. 2 for Carter Associates, Inc. to provide design <br />services for the construction of a mast arm traffic signal and associated improvements including <br />pedestrian facilities at the intersection of 21" Street SW and 27"h Avenue. <br />The purpose of Work Order No. 2 is to provide design services to improve the safety and operation <br />of the intersection of 21" Street SW and 27t1i Avenue. The proposed improvements consist <br />of the installation of a mast arm traffic signal, pedestrian crosswalks and curb ramps, <br />including sidewalk ramps, associated signage and pavement markings. The County is <br />responsible for the collection of all necessary survey work and data. Work Order No. 2 is <br />for a lump sum amount of $32,445.00 <br />FUNDING <br />Funding is budgeted and available from the Optional Sales Tax/21" Street and 27" Avenue account <br />(315214441-.066510-17002). <br />
The URL can be used to link to this page
Your browser does not support the video tag.