Laserfiche WebLink
Part 2. Design Development: <br />• CAI will meet with COUNTY staff to go over review comments prior to proceeding with <br />design development. <br />• CAI's geotechnical sub -consultant, KSM Engineering and Testing, Inc., will conduct the <br />required geotechnical investigation needed for the design of mast arm foundations. <br />• The CAI team will prepare final design development drawings including details and <br />specifications. <br />• CAI will prepare an opinion of probable construction costs. <br />• CAI will submit final design development drawings to COUNTY staff for review and <br />comment. <br />Part 3. Final Construction Pians: <br />-• CAI will address the COUNTY'S review comments and proceed with the preparation of <br />final construction drawings and specifications. <br />o CAI will update the opinion of probable construction costs. <br />m CAI will submit deliverables to the COUNTY. Final Deliverables to include five (5) paper <br />"hardcopy" signed and sealed sets of plans, Autocad drawing file in release 2013, PDF <br />formats and other pertinent documents. All electronic files to be provided on CD. <br />Assumptions: <br />In developing this proposal, CAI represents to the COUNTY that the following assumptions have <br />been made and that deviation from these assumptions may require additional services and <br />expenditures by CAI that will require additional compensation from the COUNTY: <br />1. Design and permitting of adjustments to existing water main, sanitary sewer or other utilities <br />that are in conflict with proposed improvements are not included. <br />2. The existing right-of-way will accommodate the proposed improvements. No additional <br />right-of-way or easements will be required. <br />3. The project area of development does not contain jurisdictional wetlands or threatened <br />species. <br />4. The existing north -south crosswalks on the east and west sides of 27th Avenue will remain <br />as striped. New crosswalks will be constructed running east -west on both north and south <br />sides of 21 st St SW. <br />5. The, proposed scope does not 'include roadway modifications or lane additions. CAI will <br />coordinate the placement of the mast arm on the northeast corner so that the addition of a <br />right turn lane in the future will not conflict with the proposed mast arm. <br />6. Bidding the project for construction is not included. The COUNTY will handle bidding the <br />project. <br />7. Construction Phase Services are not included but can be provided as an additional service. <br />Serving -ASuice 1911 <br />N:\PSW\P\16-72E IRC 27th Ave and 21st St SW\Proposal 10-17-2016.doc Page 2 of 3 .153 <br />