My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
11/15/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 1:10:04 PM
Creation date
12/10/2020 12:13:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• WORK ORDER NO.2 (ENGINEERING) <br />FOR <br />PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT <br />WITH <br />CARTER ASSOCIATES, INC. <br />PROJECT: <br />2711 Avenue and 2111 Street SW Intersection - Signalization Improvements <br />Indian River County Project No. 1643 <br />This Work Order No. 2 is in accordance with the existing AGREEMENT dated November 15, <br />2011 as amended November 4, 2014 between Carter Associates, Inc, (ENGINEER) and Indian <br />River County (COUNTY). This Work Order No. 2 amends the Agreement as follows: <br />SECTION I — SCOPE OF SERVICES <br />This Work Order No. 2 is for the ENGINEER to perform professional engineering services for <br />the design of signalization improvements at the intersection of 271h Avenue and 21St Street SW. <br />As agreed upon between ENGINEER and COUNTY, the ENGINEER shall provide professional <br />• services to complete all tasks as outlined in the Work Order No. 2; specifically detailed in the <br />attached proposal dated October 17, 2016, Exhibit A. <br />SECTION II — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a) Within 90 calendar days of Notice to Proceed. <br />b) Time of FINAL project completion shall be within 30 calendar days of receipt of <br />the County's review comments from the 100% "Paper Submittal". <br />2. Deliverables — The ENGINEER shall provide the COUNTY: <br />a) As defined in the attached proposal and scope of services (Exhibit A). <br />b) 60%, 90% and 100% submittals shall include 3 sets of plans, 1 original Cost <br />Estimate. <br />c) FINAL Deliverables, five (5) paper "hardcopy" signed and sealed plans (I.E. <br />Borders). Sheeted and model space (as applicable) AutoCad drawing file in <br />release 2013, PDF formats, reports, and other pertinent documents in adequate <br />• recording fashion. All electronic files to be on CD. <br />Carter Work Order No 2C:\Users\jwilliams\AppData\Local\Microsoft\Windows\Temporary Intemet Files\Content.Outlook\DA3K8007\Carter <br />Work Order No 2.docxI <br />Pagel of 3 <br />At�-3-/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.