Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />4 December 2020 <br />Page 4 <br />collected field parameters from two staff gauges (C5-SW1 and C5-SW3) for Total Ammonia <br />Nitrogen [TAN] calculation in November 2020. <br />Therefore, sampling of the four Class I landfill groundwater evaluation monitoring wells and two <br />surface water sampling locations will be included in the 2021 quarterly monitoring and reporting <br />program. <br />Title V Air Operation Permit Compliance <br />The SWDD was issued a Title V Air Operation renewal permit (Permit No. 0610015 -005 -AV) <br />effective June 1, 2017. The permit requires that the SWDD prepare and submit to FDEP and the <br />U.S. Environmental Protection Agency (USEPA), Region 4 the following: <br />• Annual statement of compliance (within 60 days after the end of the calendar year); <br />• Electronic Annual Operating Report (AOR) and Title V Emissions Fee (on or before <br />April 1 of each year, for the previous calendar year); <br />• Semi -Annual Monitoring Report (scheduled for March 1 and August 29); and <br />• Results of an annual landfill gas (LFG) sulfur content test (Annual Emissions Report for <br />Sulfur Dioxide letter report and included in the Electronic Annual Operating Report). <br />The annual emissions fee is automatically calculated based on emissions reported for marked <br />pollutants on the FDEP's electronic Annual Operating Report (EAOR). Upon submission of the <br />EAOR, the Annual Title V Emissions Fee invoice is generated, and this must be paid by April 1, <br />2021 for the 2020 reporting period. <br />Landfill Gas Migration Monitorin <br />The Class I Landfill solid waste permit also requires quarterly monitoring of LFG migration <br />around the perimeter of the site and within enclosed structures. <br />Multi Sector General Permit <br />The SWDD authorization to discharge the overflow of stormwater from the sedimentation pond <br />into the C-6 canal is governed by a five-year Multi Sector General Permit (MSGP) issued by <br />FDEP. The permit requires that the outfall be sampled quarterly during the first and fourth year <br />of the permit for a list of parameters and the results reported to the FDEP by the first quarter of <br />the fifth year of the permit. <br />NCP2020_3249/JL20060 2021 Compliance Monitorinfz Proposal <br />