Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />4 December 2020 <br />Page 7 <br />Phase 3 — Quarterly Assessment Monitoring and Reporting Both C&D Debris Disposal <br />Facility and Class I Landfill) <br />Geosyntec will perform quarterly sampling events for Calendar Year 2021 (January, April, July, <br />and October) of eight (8) groundwater wells (MW -21S, MW -33S, MW -35S, MW -40S, MW - <br />49S, MW -50S, MW -51S, and MW -52S) and seven (7) surface water sample sites (SW-LC1, <br />SW-LC2, SW-LC3, LC-SW4, LC-SW5, LC-SW6, and LC-SW8) for the C&D debris disposal <br />facility and at four (4) groundwater monitoring wells (MW -14S, MW -53S, MW -54S, and MW - <br />54I) and two (2) surface water samples (C5-SW1 and C5-SW3) for the Class I landfill. Please <br />note, Geosyntec has assumed that FDEP will not add the three (3) newly installed piezometers to <br />the C&D debris disposal facility quarterly monitoring. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take two (2) days to complete. <br />The April and October data collection and sampling will each take four (4) days to complete. <br />Geosyntec will deliver the samples to ENCO laboratory for analytical testing under SWDD's <br />contract (i.e., ENCO.will directly invoice SWDD for laboratory charges). <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. In addition, monitoring <br />wells MW -21S and MW -49S will be analyzed for 1 -methylnaphthalene, 2- methylnaphthalene, <br />anthracite, fluorene, and acenaphthene. These additional parameters were requested by FDEP as <br />part of the approval to convert these wells and surface water sites from evaluation monitoring to <br />quarterly assessment monitoring. <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(a)3, F.A.C. The surface <br />water sampling locations for the Class I landfill will be analyzed for the parameters as required <br />by paragraph 62-701.510(5)(b), F.A.C.As a reminder, this list of parameters was approved by <br />FDEP as part of Geosyntec's 20 October 2020 Work Plan. <br />Geosyntec will assist SWDD in coordinating the analytical testing activities with ENCO, notify <br />FDEP prior to sampling as required by the WQMP, review and evaluate the analytical test <br />results, and prepare a letter report for each quarterly assessment monitoring event. <br />The letter reports will be submitted in draft forms to SWDD for review and comment and will be <br />finalized, with SWDD's comments implemented, for submittal to FDEP. Any changes to the <br />monitoring and reporting requirements that might be requested by FDEP based on the results of <br />the quarterly assessment monitoring will be performed under Phase 5 below. <br />NCP2020_3249/JL20060_2021 Compliance Monitoring Proposal <br />