My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title <br />Article Number <br />Introduction <br />SC —1.00 <br />Defined Terms <br />SC —1.01 <br />Terminology <br />SC —1.02 <br />Before Starting Construction <br />SC — 2.05 <br />Preconstruction Conference <br />SC — 2.06 <br />Coordination of Plans, Specifications, and Special Provisions <br />SC — 3.06 <br />Subsurface and Physical Conditions <br />SC — 4.02 <br />Performance, Payment and Other Bonds <br />SC — 5.01 <br />Certificates of Insurance <br />SC — 5.03 <br />CONTRACTOR's Liability Insurance <br />SC — 5.04 <br />OWNER's Liability Insurance <br />SC — 5.05 <br />Property Insurance <br />SC — 5.06 <br />Waiver of Rights <br />SC — 5.07 <br />Receipt and Application of Insurance Proceeds <br />SC — 5.08 <br />Acceptance of Bonds and Insurance; Option to Replace <br />SC — 5.09 <br />Labor; Working Hours <br />SC — 6.02 <br />Concerning Subcontractors, Suppliers and Others <br />SC — 6.06 <br />Permits <br />SC — 6.08 <br />Cost of the Work <br />Sc —11.01 <br />Test and Inspections <br />SC —13.03 <br />OWNER May Stop the Work <br />SC —13.05 <br />Correction Period <br />SC —13.07 <br />Progress Payments <br />SC - 14.02 <br />Substantial Completion <br />SC —14.04 <br />00800 IF1Public Works\ENGINEERING DIVISION PROJECTSX1765 Sebastian Comers Roof Replacement\1-Admin0d DocumentsXMaster Contract DocumentsXMaster <br />Contract Documents100600 - Supplementary Conditions 05.13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.