My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br />SPECIAL PROVISIONS <br />1.1 GENERAL <br />A. Visits to the construction site may be made by representatives of permitting or <br />governing bodies. Submit details of all instructions from the above to the <br />ENGINEER immediately. The Work will not be accepted by the OWNER until final <br />acceptance has been received from the various Regulatory Agencies having <br />jurisdiction. <br />B. Furnish sufficient labor, construction equipment and materials, and work such <br />hours, including night shifts and overtime operations, as may be necessary to insure <br />the prosecution of the work in accordance with the approved progress schedule. If, <br />in the opinion of the ENGINEER, the CONTRACTOR falls behind the progress <br />schedule, take such steps as may be necessary to improve progress, all without <br />additional cost to the OWNER. The ENGINEER shall be compensated for his <br />overtime services in accordance with the Supplementary Conditions, SC -6.02. <br />C. All salvageable material and equipment for which specific use, relocation or other <br />disposal is not specifically noted, shall remain the property of the OWNER and shall <br />be delivered to the OWNER at the following location: 4550 41St Street, at the <br />CONTRACTOR's expense. All material and equipment not in salvageable <br />condition, as determined by the ENGINEER and the OWNER, shall be disposed of <br />by the CONTRACTOR, at the CONTRACTOR's expense. <br />D. In addition to these Specifications all work must comply with the requirements of the <br />local governing agency, St. Johns River Water Management District, Department of <br />Environmental Protection, Army Corps of Engineers, Indian River Farms Water <br />Control District, and all other applicable State or Federal agencies' specifications <br />and permits. In the event of a conflict, the more stringent specification or <br />requirement shall govern. <br />E. Before performing any work outside the designated limits of the work site, secure <br />any necessary permits and authorization from the applicable owner, or verify in <br />writing that such has been previously obtained. Follow all requirements of any said <br />permits or authorization. Give the ENGINEER and appropriate owner ten (10) days <br />minimum notice before commencing construction operations outside the designated <br />limits of the work site. <br />01009-1 01009 -Special Provisions <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br />Documents\Master Contract Documents\01009 - Special Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.