My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01215 <br />GENERAL QUALITY CONTROL <br />1.5 PROJECT PHOTOGRAPH SNI DEOS <br />A. The CONTRACTOR shall make provisions, at his expense, for photographs and video <br />tapes of all work areas just prior to construction, and for unusual conditions during <br />construction. The photographs and videos shall show pertinent physical features along <br />the line of construction. The purpose of the videos is to determine any damage to <br />private or public property during construction. The video must be performed by a <br />professional videographer. <br />B. Pre -Construction Photographs and Video: <br />1. Contractor shall provide the Owner with photographs and video record and one <br />copy of the existing conditions prior to construction. These photographs and <br />videos shall be a standard DVD format and shall be narrated. <br />2. The photographs and video shall include, but not be limited to, the following items <br />shown in a clear manner: <br />1) All existing features within the right-of-way. <br />2) All existing features within the temporary construction easement. <br />3) All existing features within permanent easements. <br />4) All existing features adjacent to any construction. <br />3. Detail of the photographs and video shall be such that the following examples <br />shall be clear and visible: <br />1) Cracks in walls. <br />2) Condition of fencing. <br />3) Condition of planted areas and types of vegetation. <br />4) Condition of sodded areas. <br />5) Conditions of sprinkler systems and associated controls and wiring. <br />6) Condition of signs. <br />7) Conditions of lighting and associated wiring. <br />8) Significant detail of any pre-existing damages physical features shall be <br />shown. The coverage of the photographs and video should include the <br />limits of effects of the use of vibratory rollers. <br />9) These photographs and video record shall be presented and approved <br />by the Owner prior to the Notice to Proceed. A copy shall be kept in the <br />Contractor's field office. <br />10)Payment — No additional payment will be made for this work.. <br />+ + END OF SECTION + + <br />01215-2 01215 General Quality Control <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br />Contract Documents\Master Contract Documents\01215 General Quality.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.