My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B (2)
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 12:43:49 PM
Creation date
12/31/2020 12:38:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Auhority
Subject
Sebastian Corners Roof Replacement
Project Number
IRC-1765
Bid Number
2018062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br />A. The CONTRACTOR shall be responsible for and make good all damage to <br />pavement beyond the limits of this Contract, buildings, telephone or other cables, <br />water pipes, sanitary pipes, or other structures which may be encountered, whether <br />or not shown on the Drawings. <br />B. Information shown on the Drawings as to the location of existing utilities has been <br />prepared from the most reliable data available to the Engineer. This information is <br />not guaranteed, however, and it shall be this CONTRACTOR's responsibility to <br />determine the location, character and depth of any existing utilities. He shall assist <br />the utility companies, by every means possible to determine said locations. <br />Extreme caution shall be exercised to eliminate any possibility of any damage to <br />utilities resulting from his activities. <br />1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br />A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br />boxes, inlets and similar structures in the areas of construction that are to remain in <br />service shall be adjusted by the CONTRACTOR to bring them flush with the surface <br />of the finished work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to the <br />various utility companies. <br />+ + END OF SECTION + + <br />01541-5 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br />Contract Documents\Master Contract Documents\01541 - Protection of PropertyAoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.