Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and The Roof Authority, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />PROJECT DESCRIPTION: REMOVAL AND REPLACEMENT OF EXISTING LOW SLOPE <br />ROOF SYSTEM AT INDIAN RIVER NORTH COUNTY OFFICES AT SEBASTIAN CORNERS <br />WITH A COMPLETE WATERTIGHT 20 -YEAR WARRANTABLE ASSEMBLY. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: SEBASTIAN CORNERS ROOF REPLACEMENT <br />County Project Number: IRC -1765 <br />Bid Number: 2018062 <br />Project Address: 1919 US Highway 1, Sebastian, Florida 32958 <br />ARTICLE 3 — ENGINEER <br />3.01 REI Engineers, Inc. is hereinafter called the ENGINEER and will act as OWNER's <br />representative, assume all duties and responsibilities, and have the rights and authority <br />assigned to ENGINEER in the Contract Documents in connection with the completion of <br />the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 451 calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />General Conditions, and completed and ready for final payment in accordance with <br />paragraph 14.07 of the General Conditions on or before the 601h calendar day after <br />the date when the Contract Times commence to run. <br />4.03 Liquidated Damages <br />00520 - Agreement (Public Works) REV 06-14.doc <br />00520-2 <br />F:\Purchasing\Bids\2017-2018 FY (2018000)\2018062 Sebastian Corners Roof Replacement\00520 - Agreement (Public Works) REV 06-14.doc <br />