Laserfiche WebLink
a. If so is there any information regarding how this building is constructed? <br />b. Is a concrete pad be required for the new location? <br />Answer: Due to the minimal proposed grade changes around the two metal sheds located adjacent to the <br />football field, relocation of the sheds by the contractor will not be required. The construction plans will <br />include this information. <br />Question 8: Does the County want the Bermuda sod on palates or in rolls for this project? <br />Answer: The County has no preference for how the sod arrives onsite. <br />Question 9: Would ADS pipe be an acceptable alternate for the proposed CAP pipe? <br />Answer: Please provide a bid based on the materials specified in the Bid Schedule. Substitutions will only <br />be considered after the project is awarded. <br />Question 10: Are the 5' wide coquina rock walkways the same thickness as the parking area? <br />Answer: The coquina_walkwa.ys_and _parking_areas _are both 6"_thick.pe.rthe _Bid _Schedule. <br />__,..____ <br />Question 11: Plan sheet 7 shows an area of striping removal on the existing asphalt and new <br />thermoplastic paint. Is this a part of the work for this project? <br />c. There is not line item for striping. <br />d. IF the County already has a striping sub -contractor under contract. for other County work, <br />it would be more economical for that sub to stripe this area due to minimums being <br />involved. <br />Answer: The'removal of existing striping and restriping shown in the plans will be completed by County <br />Traffic Operations Staff. The construction plans will include this information. <br />Question 12: Is there an erosion control plan showing the location of silt fence and construction <br />entrance? <br />Answer: The Erosion Control Plan is the responsibility of the contractor. County Staff will coordinate with <br />the Contractor on the selection of a construction entrance. <br />Question 13: Are there any particular specification requirements for the fill to be used in the football field <br />area? - = - - <br />Answer: Fill for the football field area must be AASHTO Class A-1. The construction plans will include this <br />information. <br />Question 14: For bidding purposed are we to assume all of the 6' chain link fence that will be removed is <br />in good condition and can be reused? <br />Answer: The existing chain link fence is in good condition and suitable for reuse. <br />Question 15: Is there a detail for the installation of the 3' high guardrail? <br />Answer: The guardrail consists of 6'6" metal posts and 25' length sections of rail. Posts shall be set in the <br />ground at 12.5' runs. While the County will provide the posts and rail for pickup from its Road and Bridge <br />Division, the contractor shall provide hardware. The construction plans will include this information. <br />Question 16: Plans state that the County is supplying the 3' high guardrail. Please provide the address for <br />the County Road and Bridge facility? <br />Answer: The County's Road and Bridge.Division is located at 4550 41st Street in Vero Beach, FL 32967. <br />