My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-191A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-191A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:05:56 PM
Creation date
1/4/2021 1:03:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/16/2018
Control Number
2018-191A
Agenda Item Number
8.I.
Entity Name
IUndian Rivern County
Subject
Victor Hart Sr. Drainage Improvements
Project Number
IRC-1760
Bid Number
20190005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"EXHIBIT A" <br />CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 40158-5 <br />GIFFORD YOUTH CENTER <br />DATED: July 20, 2018 <br />1. All activities shall be implemented following the plans, specifications and performance <br />criteria approved by this permit. Any deviations must be authorized in a permit modification <br />in accordance with Rule 62-330.315, F.A.C. Any deviations that are not so authorized may <br />subject the permittee to enforcement action and revocation of the permit under Chapter <br />373, F.S. 11 <br />2. A complete copy of this permit shall be kept at the work site of the permitted activity during <br />the construction phase, and shall be available for review at the work site upon request by <br />the District staff. The permittee shall require the contractor to review the complete permit <br />prior to beginning construction. <br />3. Activities shall be conducted in a manner that does not cause or contribute to violations of <br />state water quality standards. Performance-based erosion and sediment control best <br />management practices shall be installed immediately prior to, and be maintained during <br />and after construction as needed, to prevent adverse impacts to the water resources and <br />adjacent lands. Such practices shall be in accordance with the State of Florida Erosion and <br />Sediment Control Designer and Reviewer Manual (Florida Department of Environmental <br />Protection and Florida Department of Transportation June 2007), and the Florida <br />Stormwater Erosion and Sedimentation Control Inspector's Manual (Florida Department of <br />Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, <br />July 2008), which are both incorporated by reference in subparagraph 62-330.050(9)(b)5, <br />F.A.C., unless a project -specific erosion and sediment control plan is approved or other <br />water quality control measures are required as part of the permit. <br />4. At least 48 hours prior to beginning the authorized activities, the permittee shall submit to <br />the District a fully executed Form 62-330.350(1), "Construction Commencement Notice," <br />(October 1, 2013) (http://www.firuies.org/Gateway/reference.asp?No=Ref-02505), <br />incorporated by reference herein, indicating the expected start and completion dates. A <br />copy of this form may be obtained from the District, as described in subsection 62- <br />330.010(5), F.A.C., and shall be submitted electronically or by mail to the <br />Agency. However, for activities involving more than one acre of construction that also <br />require a NPDES stormwater construction general permit, submittal of the Notice of Intent <br />to Use Generic Permit for Stormwater Discharge from Large and Small Construction <br />Activities, DEP Form 62-621.300(4)(b), shall also serve as notice of commencement of <br />construction under this chapter and, in such a case, submittal of Form 62-330.350(1) is not <br />required. <br />5. Unless the permit is transferred under Rule 62-330.340, F.A.C., or transferred to an <br />operating entity under Rule 62-330.310, F.A.C., the permittee is liable to comply with the <br />plans, terms and conditions of the permit for the life of the project or activity. <br />6. Within 30 days after completing construction of the entire project, or any independent , <br />portion of the project, the permittee shall provide the following to the Agency, as applicable: <br />a. For an individual, private single-family residential dwelling unit, duplex, triplex, or <br />quadruplex — "Construction Completion and Inspection Certification for Activities <br />Associated with a Private Single -Family Dwelling Unit" [Form 62-330.310(3)]; or <br />b. For all other activities - "As -Built Certification and Request for Conversion to <br />
The URL can be used to link to this page
Your browser does not support the video tag.