Laserfiche WebLink
21. All wetland areas or water bodies that are outside the specific limits. of construction <br />authorized by this permit must be protected from erosion, siltation, scouring or excess <br />turbidity, and dewatering. <br />22. The operation and maintenance entity shall inspect the stormwater or surface water <br />management system once within two years after the completion of construction and every <br />two years thereafter to determine if the system is functioning as designed and permitted. <br />The operation and maintenance entity must maintain a record of each required inspection, <br />including the date of the inspection, the name and contact information of the inspector, and <br />whether the system was functioning as designed and permitted, and make such record <br />available for inspection upon request by the District during normal business hours. If at any <br />time the system is not functioning as designed and permitted, then within 30 days the entity <br />shall submit a report electronically or in writing to the District using Form 62-330.311(1), <br />"Operation and Maintenance Inspection Certification," describing the remedial actions <br />taken to resolve the failure or deviation. <br />23. The proposed project must be constructed and operated as per plans and calculations <br />received by the District on July 12, 2018. <br />24. This permit supersedes permit number 42-061-40158-3 and the conditions of this permit <br />now govern the project's construction, operation and maintenance. <br />