Laserfiche WebLink
d. Show demolition and repairs required for partial removal of existing windows and <br /> exterior demising wall. <br /> e. Expand the existing fire protection sprinkler system and fire alarm,as needed. <br /> f. Determine areas of ceiling rerriove/replacernerit for chiller line extensions If needed, <br /> electrical data connections to LT. electric room. <br /> g. Life safety, building code review to determine if exit door is needed and determine <br /> location. <br /> h. Site landscape removal,regrading and landscape irrigation replacement/modifications as <br /> needed. <br /> i. Plumbing plans showing water and sewer connection/cutting/patching of walls,as <br /> required. <br /> 3. The Architect will assist the Owner in addressing building department review comments.The <br /> Architect will assist.Owner with all building department permits and provide required <br /> documentation. Owner will pay all required building permit fees. <br /> 4. Our services will include the costs of electrical, mechanical,and structural consultants used to <br /> develop the construction documents. We will assist in bidding administration,answering,bid <br /> questions/addendums as needed. <br /> 5. The Architect will provide construction administration which would include two(2)construction <br /> observation inspections per month,shop drawing review and requests for information(RP's). <br /> R. Deliverables <br /> The Architect will provide the following documents: <br /> 1) 5 sets of signed and sealed construction documents. <br /> 2) Electronic copy of specifications, <br /> 3) Meetings with Owner as needed. <br /> 4) IVIeetings with permitting agencies having jurisdiction over the project as needed. Note: <br /> The proposed plans must receive Indian River County building permit.Any site utility <br /> design will be by Owner. <br /> 5) AutoCAD files to be delivered to Owner at 100%submittal. <br /> We anticipate the following schedule: <br /> Task Duration <br /> 1. Field work,design development 4 weeks <br /> IL Complete construction documents 8 weeks <br /> Bidding, building permit review 8 weeks <br /> IV. Construction 6 months <br /> C. Oviner's Responsibility <br /> The Owner's Responsibilities shall be as follows: <br /> 1. Provide sketch layout of floorplan. <br /> 2. Provide any existing drawings/surveys, including AutoCAD <br /> 3.• Civil engineer consultant lees if needed. <br />