My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-003A
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-003A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 3:20:28 PM
Creation date
1/12/2021 10:34:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/11/2021
Control Number
2021-003A
Agenda Item Number
Signed by County Admin
Entity Name
Hedrick Brothers Construction, Inc.
Subject
IRC Fire Department renovation - add walls/doors Change Ord No.3
Project Number
20-640-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ell HEDRICK <br />BROTHERS <br />CCSN,$T jkU.CTl <br />art%4 AA'A entiFn WAt 1-cunnno-A <br />PCCO #00.2. <br />q. <br />SubJob <br />Cost ICode <br />Desoriptlon <br />Type <br />Amount- <br />i <br />0003-PCCOp3-ADDED <br />1509-510 - ACOUSTICAL CEILING. <br />Includes cutting oxisling G(es_&track at new wall partitions. track at ,Subcontractor <br />$7,200.00 <br />WALLSIDOORS <br />new wail partitions <br />- - <br />2 <br />0003•PCCO#3,.ADDED <br />15.09.250 •DRYWALL <br />'Drywall partitions a1,12 above ratting <br />Subcontractor <br />53.300,00. <br />WALLSIDOORS <br />3 <br />0003•PCCO#3• ADDED <br />15=09:910 -PAINTING <br />Paint Drywall&doorframes <br />Subcontractor <br />$1,455:00 <br />WALLSIDOORS <br />4 <br />0003-PCCO#3-:ADDED <br />VMLLSIDOORS <br />-16-b"80=FLOORING (BASE) <br />Base only at new wail partitions -.includes 80 <br />:Subcontractor <br />$450,00 <br />Assume two windows with frames at plan east new partition wall at 42' <br />5 <br />0003•PCCO#3 ADDED <br />WALLSIDOORS <br />15.08.810-VONDOWS <br />314-117V1M. same aswdstiNinterior windowsatcanferenceroom <br />Subcontractor <br />$4,000,00. <br />A1411. <br />Assume both new doors to be wood, to match existing, with vision kits. <br />6 <br />0003-PCCO#3-;ADDED <br />OD03-P <br />-1140 - <br />15-0.13-140 - <br />Assume both doors to induda:panic hardware, storefront lockset, and <br />Subcontractor <br />56,000.00 <br />COORS <br />QOO MESAiARDWARE <br />closing device:. Both.doors to be prepped for card access. <br />7 <br />0003-PCCO#3-ADDED <br />15.15 -FIRE PROTECTION, <br />Assume Fire Protection to betimited.to relocating headswhere new <br />- <br />Subcontractor <br />SI;500:00 <br />WALLS/DOORS <br />-910 <br />Wall partitions conflict. <br />8 <br />0003-PCCO#3-ADDED <br />15.15 -710 -.HVAC <br />Assume HVACtolierelocating one supply afpWfplan east <br />-Subcontractor <br />5500.00. <br />WALLSIDOORS <br />9 <br />0003-PCCO#3- ADDED <br />15-16110- ELECTRICAL - <br />.. <br />Assume two new. .battery, operated exit lights at two new boors <br />Subcontractor <br />-$700.00 <br />WALLSIDOORS <br />0003-PCCO#3-ADDED <br />15-16.410 -LOW VOLTAGE <br />Includes card reader wiring to be run back to panel, Owner to provide <br />Subcontractor <br />$3,500.00 <br />10 <br />WALLSIDOORS <br />DISTRIBUTION <br />and install access.control devices. <br />11 <br />0003-PCCO#3-ADDED <br />10 -0.1 -560' -TEMPORARY <br />Temporary Protection <br />Materials <br />$750,00 <br />WALLSlDOORS <br />PROTECTION <br />12 <br />0003-PCCO#3-ADDED <br />j0.18-110=CONTRACTOWSFEE <br />Contmcta'sFee. <br />Overhead <br />$1;190:63 <br />WALLSIDOORS <br />13 <br />0003•PCCO93-ADDED - <br />10.18 -165 -GENERAL LIABILITY <br />- <br />General Liabiiity.lnsurance <br />Materials <br />5259.09,, <br />WALLSIDOORS <br />INSURANCE <br />14 <br />0003•PCCO#3-:ADDED <br />WALLSIDOORS <br />10.18.170-:BO.ND <br />Bond <br />:Materials <br />5198:52. <br />Subtotal: <br />$25,003:24. <br />Gland Total: <br />$26,00.24 <br />The original (Contract -Sum) <br />Net change by.previousiyauthorized Change Orders <br />The contract sum prior to this Change Order was <br />The contract sum would be changed by this Change Order in the amount. of <br />The new contract sum Including this Change Order will be <br />The contract time will notbe changed bythis'Change Order by 0 days. <br />Haydri Curtis (Donadio and Associates, <br />Architects PA) <br />SIGNATURE DATE <br />INDIAN RIVER COUNTY <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />SIG ATU E DATE.. <br />.qP1OJ,994.UU. <br />$11,443.65 <br />$774;885.65 <br />$25,003.24 <br />$799,888.89 <br />HEDRICK BROS CONST CO INC <br />2200 CENTERPARK WEST DRIVE SUITE <br />100 <br />WEST PALM BEACH, Florida: 33409 <br />1 <br />1/4/21 <br />SIGNATURE DATE <br />Hedrick Brothers Construction Go_ Inc. page 2 of 2 Printed On: 12/3112020 09:25 AM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.