My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/2020
CBCC
>
Meetings
>
2020's
>
2020
>
11/17/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 10:00:39 AM
Creation date
1/12/2021 2:52:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/17/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLE AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />PROJECT DESCRIPTION: Site work: to include demolition of existing concrete sidewalk, <br />retaining walls, stairs, removal of trees, and signs. New construction to include sidewalk, concrete <br />parking spaces, drainage improvements, signage, and stripping. <br />Structural work: to include removing interior floor sections, replacing masonry pier, replacing floor <br />beams, replacing floor joists, leveling of floor, installing new flooring, remove existing roofing, rafter <br />repairs, installing new roof sheeting and shingles, remove and replace doors, remount/ or reseal <br />windows, remove and replace sections of wood siding, painting exterior, constructing new retaining <br />wall, constructing new stairs, handrails, fencing. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: ROSELAND COMMUNITY CENTER BUILDING & SITE IMPROVEMENTS <br />(IRC -1855) <br />Bid Number: 2020053 <br />Project Address: 1297383 RD AVENUE, SEBASTIAN, FL 32958 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.