SECTION 00520 - Agreement (Public Works <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Guettler Brothers Construction LLC <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />Project Description: The Project entails re -nourishment of the County's Sector <br />3 Beach & Dune Restoration Project via placement of about 307,000 cubic yards of <br />beach -compatible sand fill and about 200,710 native dune plants over 3.7 miles of <br />Atlantic Ocean beach in central Indian River County. Sand fill is proposed to be <br />obtained from either (a) the County's Offshore Borrow Area, or (b) an upland sand <br />source pre -qualified by the County, and/or (c) an upland sand source separately. <br />approved by Florida Department of Environment Protection. To avoid adverse impacts to <br />nesting sea turtles, construction is expected to be completed during the period from <br />November 1, 2020 and April 30, 2021. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: SECTOR 3 BEACH AND DUNE RESTORATION PROJECT <br />County Project Number: IRC -1925 <br />Bid Number: 2021012 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the main part of sea turtle nesting <br />season begins in the County on April 30th, 2021 as provided in paragraph 2.03 of the <br />00520 -Agreement (Public Works) REV 10-18.doc <br />00520-2 <br />H:0ids12020-2021 FY (2021000)12021012 Sector 3 Dune Rebid100520 - Agreement (Public Works) REV 10-18.doc _ <br />