My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/2020
CBCC
>
Meetings
>
2020's
>
2020
>
11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 11:45:47 AM
Creation date
1/14/2021 11:42:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/10/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�F <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: November 2, 2020 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, PE, Utilities Engineer <br />Subject: First Amendment to Agreement between Indian River County, Florida and Vero Beach MOB, <br />LLC, for Vero Beach Medical Office Building <br />Description and Conditions: <br />On May 19, 2020, the Board of County Commissioners (BCC) approved a developer's agreement <br />between Indian River County Department of Utility Services (IRCDUS) and Vero Beach Medical Office <br />Building, LLC, (Developer) to upsize a proposed sanitary sewer force main, from 4 -inches diameter to 6 - <br />inches diameter, to allow connections from future development along Indian River Boulevard. The project <br />is now in the construction phase; however, field conditions will require revisions to the design of the force <br />main. <br />The proposed force main will be installed by the horizontal directional drill (HDD) method as opposed to <br />the open -trench method represented in Exhibit C of the approved Developer's Agreement. Also, IRCDUS <br />received development plans for a parcel adjacent to the proposed force main and requested the <br />Developer construct a connection point. Since the conditions requiring the HDD installation were not <br />evident during the design phase, and the connection point was not included in the original design, the <br />Developer has requested that IRCDUS share in the unforeseen additional cost. <br />Analysis: <br />Attachment 1 is the first amendment to the previously approved Developer's Agreement. The amendment <br />details the additional cost that IRCDUS will reimburse the Developer. As shown on the revised Exhibit C of <br />the attached first amendment, the additional cost to be paid by IRCDUS to the Developer is as follows: <br />County's Share per Developers Agreement: $6,416.51 <br />County's Share based on Additional Costs: $8,369.01 <br />Total Additional Cost to County: $1,952.50 <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.