My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/2020
CBCC
>
Meetings
>
2020's
>
2020
>
11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 11:45:47 AM
Creation date
1/14/2021 11:42:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/10/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On December 12, 2019, the Planning and Zoning Commission (PZC) granted major site plan approval for a <br />39:03 -acre project to be known as the FPL Indian River Service Center. Improvements to the site will include <br />a two-story office building, a fleet services garage, two warehouses, a storm shelter, a 6,000 -gallon fueling <br />system, a data center and a truck supply building. The site is zoned IL, Industrial Light. The uses proposed <br />by FPL for the site are permitted in the IL zoning district, but since the site plan exceeds 150,000 square feet, <br />the project required PZC approval. <br />Because of its size and location, FPL was required to make certain dedications and off-site improvements. <br />Those improvements include: <br />• 20' Right -of -Way Dedication for 16th Street without compensation for Phase 1. (Completed) <br />• 60' Right -of -Way Dedication for 98th Avenue without compensation for Phase 1. (Completed) <br />• Construction of 16th Street from the first driveway connection to 98th Avenue is to include the <br />westbound left turn lanes for both entrances and an eastbound left turn lane at 98th Avenue, prior to <br />issuance of a certificate of occupancy (C.O.) for Phase 1. Construction of the remainder of 16th Street <br />from the west property line to the first driveway connection to the site is to occur prior to issuance of <br />a C.O. for Phase 2. <br />• Reconstruction of 98th Avenue from the southern property line to SR 60 is to include 12 -foot travel <br />lanes, and five (5) -foot bike lanes and a southbound right turn lane on 98th Avenue at 16th Street, <br />prior to issuance of a C.O. for Phase 2. <br />• 16th Street Sidewalk: A 5' wide sidewalk is to be constructed with associated ROW improvements as <br />shown on the project's site plan. The final design of the 16th Street sidewalk will be reviewed and <br />approved by the Public Works Department via the County right-of-way permitting process, and must <br />be constructed prior to the issuance of a C.O. for Phase 2. <br />• 98th Avenue Sidewalk: A 5' wide sidewalk is required along the site's entire 98th Avenue frontage. <br />The final design of the 98th Avenue sidewalk will be reviewed and approved by the Public Works <br />Department via the County right-of-way permitting process, and must be constructed prior to the <br />issuance of a C.O. for Phase 2. <br />• Streetlighting: Streetlights are required and will be maintained by FPL. The proposed streetlight <br />locations and details are depicted on the project's site plan, and those streetlighting improvements <br />must be installed, prior to the issuance of a C.O. for each respective phase. <br />In order to set forth more specific timing and payment schedules for the required construction, the parties <br />have agreed to enter into a Developer's Agreement (attached to this memorandum). FPL will construct the <br />roadway improvements at a cost of $1,683,369.62. In exchange for the construction costs, the County will <br />reimburse FPL for the design, engineering and construction of improvements that would have been <br />performed by the County in the near future. The improvements include, the addition of 5 -foot paved <br />shoulders, drainage improvements, and asphalt paving on the roadway section north of the projects north <br />property line. The cost of said improvements is not to exceed $378,689.52, as depicted on the Engineer's <br />Cost Estimate dated October 22, 2020, attached to the Developer's Agreement as Exhibit "B". Payment shall <br />be remitted to FPL within thirty (30) days after receipt of the signed bill of sale. All road construction pursuant <br />to this Agreement shall be in compliance with Florida Department of Transportation standards. <br />C.IU rsllegismrUppDawIL,wnTempOCL TechoologieslearyPDF81(BCL(a)16OE9B7DI BCLQl00E9B7D.doc - - 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.