My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-004
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 11:08:14 AM
Creation date
1/15/2021 11:04:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/05/2021
Control Number
2021-004
Agenda Item Number
7.F.
Entity Name
Florida Department of Environmental Protection,
Coastal Partnership Jones' Pier Conservation Area Saltmarsh
Wetland and Hydric Hammock Restoration
Subject
Amendment No.2 to Agreement No. CZ219
Attachment 3B Revised Grant Work Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCATION: 7770 Jungle Trail, Vero Beach, FL 32963 <br />PROJECT BACKGROUND: This property was acquired by the County in 2008 with assistance from <br />Florida Communities Trust. A management plan (recently updated) outlines various public access <br />facilities to be incorporated into the site design. Proposed amenities include parking, restroom, pavilion, <br />walking trails, boardwalks, and ecological enhancement projects. This grant will assist the County with <br />the construction of a 4 -acre high marsh community and transitional hammock that will provide diverse <br />habitat, increased biodiversity, improved wildlife habitat, and will adapt to the changing environment. <br />PROJECT DESCRIPTION: The project includes construction of a 4 -acre salt marsh that will receive pumped <br />Lagoon waters and circulating these waters through an estuarine system that will remove nutrients, <br />suspended solids, and other pollutants prior to discharge back into the Lagoon. Adjacent to this salt marsh <br />the County is restoring a hammock that was heavily invaded by exotic species. The hammock/flow-way <br />marsh community to be restored will provide filtration (where feasible) of untreated stormwater from an <br />existing perimeter ditch that currently discharges directly into the lagoon. Through this habitat <br />enhancement project, the County envisions a mulit-faceted project that improves local water quality in the <br />Lagoon, provides foraging and roosting areas for a variety of listed and non -listed species, creates nursery <br />habitat for fish, improves shoreline conditions, and provides passive recreation and educational <br />opportunities for the public. <br />TASKS and DELIVERABLES: <br />Task #1: Construction of Salt Marsh <br />Task Description: This task will involve site clearing, excavation/grading, and planting of a 4 -acre salt marsh. <br />Influent and effluent structures under Jungle Trail, as well as fish friendly pump will be installed to maintain <br />hydrology. A water control structure will be constructed at the discharge point from the wetland into an adjacent <br />ditch (which drains into the Lagoon). <br />Deliverables: Executed contract for the construction, signed acceptance of the completed work by the Grantee and <br />certified by the Engineer of record. Before, during and after photos of the construction of the Salt Marsh. <br />Task #2: Construction of Hydric Hammock Restoration <br />Task Description: This task will involve excavation/grading, and planting of the hydric hammock. Influent and <br />effluent structures will be installed to maintain hydrology. <br />Deliverables: Executed contract for construction and signed acceptance of the completed work by the Grantee and <br />certified by the Engineer of record. Before, during and after photos of the hammock restoration project. <br />Performance Standard: The Department's Grant Manager will review the deliverables to verify that they meet the <br />specifications in the Grant Work Plan and this task description. Upon review and written acceptance by the <br />Department's Grant Manager of all deliverables under this task, the Grantee may proceed with payment request <br />submittal. <br />Payment Request Schedule: Grantee may submit a payment request for cost reimbursement upon completion of <br />the task and Department approval of all associated task deliverables. <br />Attachment 3-A, DEP Agreement #: CZ219-A2 <br />2of3 <br />Rev. 4/30/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.