My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-012
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:30:49 AM
Creation date
1/21/2021 2:44:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/12/2021
Control Number
2021-012
Agenda Item Number
8.E.
Entity Name
Florida Department of Transportation (FDOT)
Subject
State Funded Grant Agreement for construction and CEI services resurfacing
69th Street from 66th Avenue to SR5/US-1
Project Number
IRC-1639, FM No. 438073-1-54-01
Document Relationships
2021-005
(Agenda)
Path:
\Resolutions\2020's\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
View images
View plain text
DocuSign Envelope ID: F2D8E6E0-785F-4915-B181-AE7F98512D16 <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 526.010-60 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />osn7 <br />Page 1 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 438073-1-54-01 <br />This exhibit forms an integral part of the State -Funded Grant Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 2.540 MILES. Begin mile post 1.981 to end mile post 4.532.69th Street from <br />66th Avenue to SR-5/US-1. <br />PROJECT DESCRIPTION: RESURFACING 69th Street from 66th Avenue to SR-5/US-1. <br />The proposed improvement will include the reconstructing the roadway utilizing full depth reclamation, new asphalt concrete <br />pavement signing and pavement markings. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by December 31, 2022 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: The DEPARTMENTwill hold Construction Notice to Proceed (NTP) until <br />design plans are submitted by the RECIPIENT and approved by the DEPARTMENT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).