My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/22/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
09/22/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:31:45 PM
Creation date
1/22/2021 12:24:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/22/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Prior to the issuance of a land development permit for Phase I, the applicant shall: <br />a Submit a sign package for the Market Place commercial/area and obtain approval <br />of the sign package from staff. The sign package must comply with County <br />Corridor Plan requirements and demonstrate a consistent aesthetic theme for the <br />entire project. <br />b. Provide a final design, acceptable to Traffic Engineering and MPO Staff, for the <br />project transit stops. <br />C. Provide a final design, acceptable to Engineering, for stormwater capacity for run- <br />off from adjacent public roads. <br />6. Prior to the issuance of the first certificate of completion for any preliminary PD plan <br />within any sub -phase of Phase I, the applicant shall: <br />a. Complete or bond out the sidewalk segment on 49th Street and 58th Avenue adjacent <br />to Phase 1. <br />b. Pave that portion of 53rd Street from 58th Avenue to the western project driveway. <br />Complete all site related traffic improvements depicted on the preliminary PD plan <br />and listed in section 13 of the staff report that serve that portion of Phase 1 or sub - <br />phase of Phase 1. <br />7. Prior to issuance of a certificate of completion for Phase lb, the applicant shall pave that <br />portion of 491h Street adjacent to Phase 1 b as shown on the preliminary PD plan <br />8. Prior to or via the final plat approval for Phase 1, the applicant shall dedicate the 120' <br />right-of-way for 53rd Street to the county, subject to the terms of a developer's agreement. <br />9. Prior to the issuance of a certificate of completion for Phase II, the applicant shall complete <br />all site -related traffic improvements required to serve Phase II, as identified by Traffic <br />Engineering and listed in the approved traffic impact analysis. <br />10. Prior to issuance of a certificate of completion for Phase III, the applicant shall complete all <br />site -related improvements required to serve Phase III, as identified by Traffic Engineering <br />and listed in the approved traffic impact analysis. <br />11. Prior to or via the final plat for Phase IIA, the applicant shall escrow the applicant's fair <br />share for the future paving of the project's remaining 53rd Street frontage. <br />12. All preliminary PD plan/plats shall be subject to the following conditions: <br />a. All Market Place blocks and all mixed use areas shall be subject to and shall <br />demonstrate compliance with the County Corridor Criteria or Planning & Zoning <br />Commission approved alternative requirements for landscaping. <br />Attachmel?Q <br />FACommunity Deve1opment\CurDev\BCC\2013 BCC\ProvidencePointeconceptappltr.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.