Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified /or ` dicated in> the Contract <br />Documents. The Work is generally described as follows: <br />The proposed improvements to the IRC C <br />spalled concrete, rehabilitation of stair <br />deck expansion joints, replace existing <br />coating, and restripe parking spaces' <br />replacement of existing drain bowl clamp <br />of existing metal door frames. All/ work <br />building code requirements. _ \ \ <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under, the <br />part is generally descr"ibetl-as follows:�� <br />Project Name: INDIAN -RIVER C1 <br />Parking Garage includeiepair of <br />replacement of existing parking <br />ant materials, instail new traffic <br />markings. Also includes the <br />ench�drain ler and the removal <br />form to. current local and state <br />iments may be the whole or only a <br />County Project'Number�IRC-1801A <br />Bid Number: , 2020056'\\ <br />Project Address: \ 2065 1.6T" Avenue, Vero Beach, FL 32960 <br />ARTICLE 3_,ENGINEER .\ <br />3.01 The Indian R eiv r -County Public Works Department is hereinafter called the ENGINEER and <br />`'�,will act.as OWNER's''representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the complet�n ofthe Work in accordance with the Contract Documents. <br />- i <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 60 calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />17 <br />