Laserfiche WebLink
G <br />Account Name Account Number Budgeted Amount <br />Sector 3 Beach and Dune Restoration Fund 12814472-066514-17001 $14,800,000.00 <br />Sector 7 Beach and Dune Restoration Fund 12814472-066512-17001 $9,900,000.00 <br />RECOMMENDATION <br />Previously, staff recommended an easement percentage of 90% or greater in each respective <br />sector in order to proceed with the Beach and Dune Restoration Project(s) which was accepted <br />by the BCC. The recommendations below take into account that goal, as well as financial <br />considerations after bid opening. <br />• SECTOR 3 <br />Sector 3 easements are currently at 77% of the targeted properties representing 83% of the <br />total project area, several of the unresponsive easements targeted are located in one area. <br />Although the goal of easements has not yet been met, staff would recommend moving forward <br />with this project with the continued pursuit of remaining easements while the contractor <br />mobilizes and prepares for sand placement beginning November 1, 2020 if not for the fact that <br />the apparent low bidder has requested to withdraw their bid, and the successor low bid of <br />$29,000,250.00 was not fully budgeted. Thus, staff recommends the following actions for the <br />Sector 3 Beach and Dune Restoration Project: <br />1. Direct staff to file a claim on the bid bond posted by Ahtna, the apparent low <br />bidder, since their request for withdrawal of their bid, received after the 24 hour <br />withdrawal period under the bid documents, makes this project unable to move <br />forward financially and the County has invested significant costs in preparing the <br />project for bid this year and time in the review of their bid prior to request for <br />withdrawal. <br />2. Reject all bids due to the significant difference between the Engineers Opinion <br />of Probable Cost and the costs shown in the remaining responsive bids received. <br />(A) Delay the Sector 3 project until next year (2021/22) in order to attempt to <br />solicit more competitive bids when the industry may be more receptive to <br />projects the size of our Sector 3 project. Staff will also be seeking extensions <br />from FEMA and FDEP for their funding awards, however, it should be noted that <br />if not approved, these grant funds would be lost. <br />(B) Rebid a portion of the Sector 3 project area this year (to be determined by <br />the Engineer). This approach would require that the remaining portion of the <br />Sector 3 project area be bid next year (construction to take place in 2021/22). A <br />smaller project size could be completed during our construction window, even <br />with rebidding a revised project area and might result in more competitive bids <br />received. <br />• SECTOR 7 <br />As the current percentage of easements for the Sector 7 Beach and Dune Restoration Projeq o <br />