Laserfiche WebLink
COST ESTIMATE FOR 12TH AVENUE <br />(BETWEEN 12TH & 14TH STREET) <br />TOTAL L.F. 1286 <br />TOTAL F.F. 2,521.1 <br />1. ENGINEERING $ 3.716.96 <br />2. CONSTRUCTION $ 51.440.00 <br />BASED ON $40/L.F. <br />3. ADMINISTRATION $ 1,651.83 <br />2.994781% OF <br />ENGINEERING & <br />CONSTRUCTION <br />TOTAL COST OF PROJECT $ 56,808.79 <br />75% TO BE PAID BY PROPERTY OWNER $ 42.606.59 <br />25% TO BE PAID BY COUNTY $ 14.202.20 <br />COST PER F.F. $ 16.90 <br />12ave. pp <br />