Laserfiche WebLink
COST ESTIMATE FOR 35TH AVENUE <br />(FROM 4TH STREET TO 6TH STREET) <br />TOTAL L.F. 1.300 <br />TOTAL F.F. 1,166.30 <br />1. ENGINEERING $ 3,757.78 <br />2. CONSTRUCTION $ 39.000.00 <br />BASED ON $30/L.F. <br />3. ADMINISTRATION $ 1.281.71 <br />2.997607% OF <br />ENGINEERING & <br />CONSTRUCTION <br />TOTAL COST OF PROJECT $ 44.039.49 <br />75% TO BE PAID BY PROPERTY OWNER $ 33,029.62 <br />25% TO BE PAID BY COUNTY $ 11.009.87 <br />COST PER F.F. $ 28.32 <br />35thave.pp <br />