Laserfiche WebLink
MAILING ADDRESS: <br />CITY, STATE, ZIP: <br />ASSESSMENT AMOUNT: <br />4/3/90 UTIL (NSWRUSI.WFM):nr <br />-------------------------------------------- <br />12 33 39 00000 1000-027.1 <br />VINEYARD INDUSTRIES <br />(PHILIP W. VINEYARD) <br />-------------------------- <br />2. PARCEL I.D. NO: <br />OWNER: <br />MAILING ADDRESS: <br />CITY, STATE, ZIP: <br />ASSESSMENT AMOUNT: <br />------------------------ <br />3. PARCEL I.D. NUMBER: <br />OWNER: <br />MAILING ADDRESS: <br />CITY, STATE, ZIP: <br />ASSESSMENT AMOUNT: <br />4880 37TH STREET SOUTH <br />ST. PETERSBURG, FL 33711 <br />LINE COST & ENGINEERING <br />FEE: 18,182 SQ. FT. = $5,636.32 fj <br />----------------------------------- �( <br />12 33 39 00000 1000-027.0 <br />VINEYARD INDUSTRIES <br />(PHILIP W. VINEYARD) <br />4880 37TH STREET SOUTH <br />ST. PETERSBURG, FL 33711 <br />LINE COST & ENGINEERING <br />FEE: 29,835 SQ. FT. = $ 9,248.68 <br />LIFT STATION LUMP SUM = $12,000.00• <br />TOTAL = $21,248.68 ; <br />----------------------------------- <br />12 33 39 00000 1000-028.0 <br />FIRST UNION NATIONAL BANK <br />(MR. AUSTIN) <br />P. 0. BOX 2080 <br />JACKSONVILLE, FL 32231 <br />LINE COST & ENGINEERING <br />FEE: 41,250 SQ. FT. = $12,787.27 <br />LIFT STATION LUMP SUM = $12,000.00 <br />TOTAL = $24,787,27 <br />----------------------------------- <br />-1- <br />C) <br />O <br />co <br />C1 <br />-D <br />t7 <br />N <br />N <br />Y <br />