Laserfiche WebLink
COST ESTIMATE FOR 15TH PLACE <br />(EAST OF U.S.#1 TO 7TH AVENUE) <br />TOTAL L.F. 373 <br />TOTAL ACRES 2.79 <br />1. ENGINEERING $ 1,691.00 <br />2. CONSTRUCTION $ 10.854.30 <br />BASED ON $29.10/L.F. <br />3. ADMINISTRATION $ 376.57 <br />3.0017% OF ENGINEERING <br />& CONSTRUCTION <br />TOTAL COST OF PROJECT $ 12,921.87 <br />75% TO BE PAID BY PROPERTY OWNER $ 9,691.40 <br />25% TO BE PAID BY COUNTY $ 3,230.47 <br />COST PER ACRE $ 3,473.62 <br />15plaee2.pp 5/25/90 <br />