My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-146
CBCC
>
Resolutions
>
1990'S
>
1990
>
1990-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 10:43:18 AM
Creation date
1/26/2021 11:27:17 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1990-146
Approved Date
09/23/1990
Agenda Item Number
No data from migration
Entity Name
Summer Place and Spring Place
Subject
Costs for Intallation of Water Distribution System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9114/90RES03(Legal)Vk/WMc <br />RESOLUTION NO. 90-_lar, <br />A RESOLUTION OF INDIAN RIVER COUNTY CERTIFYING <br />"AS-BUILT" COSTS FOR INSTALLATION OF A WATER <br />DISTRIBUTION SYSTEM IN SUMUIERPLACE AND SPRING <br />PLACE, AND OTHER CONSTRUCTION NECESSITATED BY SUCH <br />PROJECT; PROVIDING FOR FORMAL COMPLETION DATE, AND <br />j� DATE FOR PAYMENT WITHOUT PENALTY AND INTEREST. <br />4` WHEREAS, the Board of County Commissioners of Indian <br />River County determined that the improvements for the <br />property located with boundaries as described in this title <br />were necessary to promote the public welfare of the county; <br />and <br />WHEREAS, on April 3, 1990, the Board held a public <br />hearing at which time and place and the owners of the <br />property to be assessed appeared before the Board to be <br />heard as to the propriety and advisability of making such <br />Improvements; and <br />WHEREAS, after such public hearing was held the County <br />Commission adopted Resolution No. 90-42, which confirmed the <br />special assessment cost of the project to the property <br />specially benefited by the project in the amounts listed In <br />an attachment to that resolution; and <br />WHEREAS, the Director of Utility Services has certified <br />the actual "as-built" cost now that the project has been <br />completed are less than in confirming Resolution No. 90-42, <br />NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY <br />COMMISSIONERS OF INDIAN RIVER COUNTY, FLORIDA, that: <br />1. Resolution No. 90-42 is modified as follows: The <br />completion date for the referenced project and the last day <br />that payment may be made avoiding interest and penalty <br />charges is ninety (90) days after passage of this <br />resolution. <br />2. Payments bearing interest at the rate of 12% per <br />annum may be made in five annual installments, the first to <br />be made twelve (12) months from the due date. The due date <br />is ninety (90) days after the passage of this resolution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.