My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/1995
CBCC
>
Meetings
>
1990's
>
1995
>
5/23/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:11 PM
Creation date
6/16/2015 2:35:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/23/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOS aft 192 <br />Anthony Donadio, president of Donadio and Associates, <br />Architects, supplied background information and advised that his <br />work has been completed. They are ready to submit the application, <br />but need a pledge from the County for matching funds, dollars and <br />in-kind services. Mr. Donadio advised that the building is sound, <br />and gave a brief overview of the services which had been performed <br />and reviewed his preliminary cost estimates as follows: <br />DONADIO AND ASSOCIATES, ARCHI'T'ECTS, P.A. <br />,&RCHMCTM .PLANNING . CONSTRUCTION MANACvKMF.NT <br />PRELIMINARY COST ESTIMATE <br />OLD INDIAN RIVER COUNTY COURTHOUSE RESTORATION <br />INDIAN RIVER COUNTY <br />PHASE 1 <br />RESEARCH & ARCHITECTURAL PLANNING <br />9432 <br />Research & Arcttltectural Planning <br />934.540.00 <br />PHASE D <br />EXTERIOR & BUILDING STABILIZATION <br />9432 <br />Cmncaal Conditions <br />75,000 <br />Impact Few <br />6+000 <br />Asbestos Abatemert <br />16,000 <br />Foundation Repans <br />3.000 <br />I.andwaping <br />10,650 <br />Cmc Wit Sty - <br />15,000 <br />Handicap Ramps <br />12,500 <br />Interior Demolition <br />29,500 <br />Exterior Demolition <br />7,500 <br />Concrete Walkway Demolition <br />27,500 <br />MasoW Rcpdrs <br />58,750 <br />Miscellaneous Metals <br />10,200 <br />ScafTolding <br />21,230 <br />Roof Repair <br />32,000 <br />Sealant -R,500 <br />Wroofing . <br />aterp <br />3,500 <br />Water Repellant <br />89000 <br />Windows <br />409000 <br />painfift <br />10,500 <br />Stucco Repair <br />2,.500 <br />Plater Repair <br />4.000 <br />Flooring <br />19,500 <br />Interior Walls <br />9+000 <br />Acoustical Ceiling Tile <br />100500 <br />Interior Wafscot <br />MOD <br />Plumbing <br />30,000 <br />HVAC <br />200,000 <br />Fire Sprinkler <br />100,000 <br />Electrical — <br />30,000 <br />Arei,itertural &_ Engineering Feex <br />�•• <br />Sub Total <br />$864,350 <br />IQ%QantingnGSW �,,, <br />s86'435 <br />Total - <br />S"0+70 <br />34 <br />May 23, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.