Laserfiche WebLink
75% To Be Paid by Property Owners $306,965.00 <br />25% To Be Paid by County $102,321.67 <br />TOTAL RESIDENTIAL UNITS 2117 <br />COST PER RESIDENTIAL UNIT $145.00 <br />x. <br />t1 <br />3R � <br />P <br />hZ . <br />_ <br />COST ESTIMATE FOR <br />CONSTRUCTION OF A RECREATION <br />PATH <br />ON THE WEST SIDE OF A1A <br />FROM THE SOUTH CITY LIMIT OF VERO BEACH <br />TO THE SOUTH MOORINGS LINE (SPYGLASS LANE) <br />1. <br />Construction <br />$385,787.00 <br />Based on $26.50/lf <br />2. <br />Engineering <br />$ 15,474.44 <br />3. <br />Administration <br />8,025.23 <br />2% of Engineering and <br />Construction <br />TOTAL COST OF PROJECT <br />$409,286.67 <br />75% To Be Paid by Property Owners $306,965.00 <br />25% To Be Paid by County $102,321.67 <br />TOTAL RESIDENTIAL UNITS 2117 <br />COST PER RESIDENTIAL UNIT $145.00 <br />