My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/2020
CBCC
>
Meetings
>
2020's
>
2020
>
12/08/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 1:26:14 PM
Creation date
1/29/2021 1:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/08/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 19 <br />Attachment B: Supporting Research <br />November 24, 2020 <br />Update 2 — Research Review Phase of IRL Plan <br />engineer of the project to ensure appropriate nutrient levels are being removed via retention times and <br />to ensure proper water volumes are being treated by the stormwater system. <br />State water quality standards are established by the FDEP are set forth in chapters 62-4, 62-302, 62- <br />520, and 62-550, F.A.C. These standards are regulated at the state -level review process for permits. <br />Surface and groundwater discharges from stormwater management systems, works, and other projects <br />may not cause or contribute to a violation of state water quality standards. Once the loading is set by the <br />state, County reviewers determine if the treatment is appropriate for the levels needing to be obtained. <br />The engineer of the project determines how much water needs to be held by the stormwater system to <br />reach these levels, and communicates this as part of the County's permit application. County reviewers <br />will communicate back -and -forth with the engineer until adequate revisions have been made based on <br />these calculations. <br />The County should continue to enforce and update its stormwater management -related ordinances <br />as new practices and technologies emerge. The County should also continue working relationships with <br />state reviewers to ensure proper nutrient removal levels and practices are achieved throughout the <br />permitting process as state rules and regulations change. It is important to maintain flood prevention not <br />only for buildings and for homes, but also to reduce the amount of runoff that flows into the canals before <br />having adequate time for nutrients to settle. Excess, untreated stormwater can be detrimental to the <br />Lagoon, so it is especially important to issue, maintain, and verify compliance for these permits <br />throughout their lifecycles to protect and positively impact the quality of the Lagoon. <br />120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.