My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/2020
CBCC
>
Meetings
>
2020's
>
2020
>
12/08/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 1:26:14 PM
Creation date
1/29/2021 1:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/08/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In Planning staff's opinion, the PD rezoning option is an appropriate mechanism for approving a mixture of <br />residential unit types within the C/I, Commercial/Industrial land use designation. Unlike other zoning <br />districts, the PD zoning district allows the County to consider the appropriateness of the proposed <br />development design and project benefits as part of the rezoning request. <br />The PD Rezoning Process: <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1. Rezoning and Conceptual PD Plan Approval: Review and recommendation made by staff <br />and by the PZC. Final action taken by the BCC. <br />STEP 2. Preliminary PD Plan/Plat (combination of site plan and preliminary plat) Approval: Review <br />and recommendation made by staff. Final action taken by the PZC. Must comply with the <br />approved conceptual PD plan and any conditions imposed by the BCC at the time of PD <br />zoning approval (Step 1). <br />STEP 3. Land Development Permit (LDP) or LDP Waiver: Reviewed and issued by staff for <br />construction of subdivision improvements (road, utilities, drainage). <br />STEP 4. Building Permit(s): Reviewed and issued by staff for construction of buildings. <br />STEP 5. Final PD Plat Approval: Review and recommendation made by staff. Final action taken by <br />the BCC. <br />STEP 6. Certificate of Occupancy: Issued by staff (after inspections) for use and occupancy of <br />buildings. <br />The applicant is seeking approval of Step 1 at this time. Once a PD conceptual plan is approved, only <br />minor modifications to the conceptual plan may be approved at a staff level. Any changes proposed to an <br />approved conceptual plan that would significantly reduce setbacks (by more than 20%), intensify the site <br />use (e.g. increase the maximum number of units), or reduce compatibility elements (e.g. reduce buffering) <br />may be approved only via a process involving public hearings held by both the PZC and the BCC. <br />Proposed PD District for the Project Site: <br />The subject site has a C/I, Commercial/Industrial land use designation. Since the land use designation <br />controls the use of the property by limiting the zoning districts applicable to the property, any rezoning <br />must be compatible with the uses and densities allowed by the property's land use designations. Once a <br />specific PD rezoning is approved for a site, the applicable PD conceptual plan adopted as part of the <br />rezoning will control the types of specific uses and the densities allowed on the subject site. The conceptual <br />plan will also establish the dimensional criteria applicable to the site. <br />Although PD zoning district parameters are flexible, certain standards related to uses, compatibility <br />(buffering), infrastructure improvements, dimensional criteria, and open space areas are set forth in Chapter <br />915 (P.D. Process and Standards for Development ordinance) of the County's land development <br />regulations (LDRs). The LDRs identify that the MED zoning district should meet a residential equivalency <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.