Laserfiche WebLink
FF,_ -1 <br />Boos 95 PmL <br />Director Boling advised that it would not, as the section of <br />the regulations that deals with excavation incidental to <br />development projects does not include this section that is being <br />amended; the proposed changes only apply to mining operations. <br />Mr. Luethje then inquired whether exceeding the 5,000 cubic <br />yards on a removal in a site plan for the exemption pertained to <br />this regulation, and Director Boling stated that is a separate <br />section. There are other sections of the mining ordinance that <br />would apply, such as bonding, but the section to be amended would <br />not apply to incidental excavation. <br />Mr. Luethje believed there are situations where the neighbors <br />would not object and asked that the Board review each mining <br />application on an individual basis and not add this 500 foot <br />setback. He felt that the mining requirements actually should be <br />reduced and handed out a cross-section showing the 10 mile coastal <br />ridge that runs along the railroad and US #1. He indicated an <br />area from I-95 to the coastal ridge where the water is trapped. <br />Insurance maps show flood areas there and the water can only be <br />relieved through the south relief canal, the main relief canal, the <br />north relief canal, or the south prong of the St. Sebastian River. <br />He believed there are benefits from mining operations to. the <br />floodplain displacement problem in this area. He asked that the <br />Board remove this item and consider a workshop to further discuss <br />the matter. Mr. Luethje felt that the more retention areas and <br />lakes and ponds that can be constructed, the less flooding will <br />occur in this particular area and the better the situation will be. <br />Vice Chairman Adams thought that a workshop would be a good <br />idea; however, the current concern is the closeness of homes to <br />these sand mine operations and "temporary" takes on a new tone when <br />some of these operations run 15 years. <br />Mr. Luethje believed there is a need to reduce the number of <br />mines active at one time but did not want to see the mining <br />operations reduced because he felt that is a benefit that we need - <br />to look at and that we need hundreds of acres of lakes to help <br />retain some of the water. Indian River Farms Water Control <br />District maintains the water out there at about a 15 foot elevation <br />while the ground out there is 20 to 21 feet. If we maintain our <br />lakes at that same elevation, we will have more floodplain <br />displacement. <br />Brian Jenkins of 7150 20th Street agreed with Dean Luethje and <br />added that it is hard to find and afford a site of more than 40 <br />acres. If the 500 foot setback is established, you would need 100 <br />8 <br />MAY 319 1995 <br />