My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/01/2020
CBCC
>
Meetings
>
2020's
>
2020
>
12/01/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 12:44:37 PM
Creation date
2/4/2021 11:16:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/01/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) The contractor agrees to include these requirements in each subcontract exceeding $100,000 <br />financed in whole or in part with Federal assistance provided by FEMA. <br />E. Energy Policy and Conservation Act: <br />The Contractor agrees to comply with mandatory standards and policies relating to energy efficiency <br />which are contained in the state energy conservation plan issued in compliance with the Energy Policy <br />and Conservation Act. <br />Suspension and Debarment: <br />(1) This contract is a covered transaction for purposes of 2 C.F.R. pt. 180 and 2 C.F.R. pt. 3000. As such <br />the contractor is required to verify that none of the contractor, its principals (defined at 2 C.F.R. § <br />180.995), or its affiliates (defined at 2 C.F.R. § 180.905) are excluded (defined at 2 C.F.R. § 180.940) or <br />disqualified (defined at 2 C.F.R. § 180.935). <br />(2) The contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, subpart C and <br />must include a requirement to comply with these regulations in any lower tier covered transaction it <br />enters into. <br />(3) This certification is a material representation of fact relied upon by Indian River County. If it is later <br />determined that the contractor did not comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000, <br />subpart C, in addition to remedies available to the State of Florida and Indian River County), the Federal <br />Government may pursue available remedies, including but not limited to suspension and/or debarment. <br />(4)'The bidder or proposer agrees to comply with the requirements of 2 C.F.R. pt. 180, subpart C and 2 <br />C.F.R. pt. 3000, subpart C while this offer is valid and throughout the period of any contract that may <br />arise from this offer. The bidder or proposer further agrees to include a provision requiring such <br />compliance in its lower tier covered transactions. <br />G. Byrd Anti -Lobbying Amendment: <br />Contractors who apply or bid for an award of $100,000 or more shall file the required certification. Each <br />tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any <br />person or organization for influencing or attempting to influence an officer or employee of any agency, <br />a member of Congress, officer or employee of Congress, or an employee.of a member of Congress in <br />connection with obtaining any Federal contract, grant, or any other award covered by 31 U.S.C. § 1352. <br />Each tier shall also disclose any lobbying with non -Federal funds that takes place in connection with <br />obtaining any.Federal award. Such disclosures are forwarded from tier to tier up to the recipient. <br />H. Procurement of Recycled/Recovered Materials: <br />(1) In the performance of this contract, the Contractor shall make maximum use of products containing <br />recovered materials that are EPA -designated items unless the product cannot be acquired— <br />(i) Competitively within a timeframe providing for compliance with the contract performance <br />schedule; <br />(ii) Meeting contract performance requirements; or <br />(iii) At a reasonable price. <br />(2) Information about this requirement is available at EPA's Comprehensive Procurement Guidelines we <br />bsite, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA - <br />designated items is available at http://www.epa.gov/cpg/products.htm. <br />I. Access to Records: <br />The following access to records requirements apply to this contract: <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.