Laserfiche WebLink
Conservation Area Status — Construction Phase <br />Conservation <br />Area <br />• Initial survey work complete <br />Conceptual design to be <br />Lost Tree Island <br />' Strategic design meetings underway <br />completed in mid -2021 <br />Harmony Oaks <br />• Conceptual design under development <br />completed in FY 21/11 <br />• BOCC update planned as part of design process <br />Sebastian <br />• Trails & boardwalks complete <br />Bidding for parking and <br />Harbor Preserve <br />• Site plans & permitting complete (parking & pavilions) <br />picnic improvements in early <br />• Pavilion 80% complete — FPL to relocate power for <br />2021 <br />South Prong <br />Preliminary survey complete <br />Permitting to be complete by <br />Slough <br />Site plan under development <br />late 2021 — construction <br />2021 <br />bidding to follow <br />Conservation Area Status — Construction Phase <br />Conservation <br />Area <br />Milestones <br />Anticipated Timing <br />• Wetland boardwalk completed in 2020 <br />Improvements planned to be <br />Harmony Oaks <br />. Planning possible kayak launch & limited parking <br />completed in FY 21/11 <br />• Trails stem complete with new boardwalk <br />• Wetland construction is 90% complete — awaiting <br />Improvements to be complete <br />pump installation & planting <br />in mid -2021 <br />• Pavilion 80% complete — FPL to relocate power for <br />restroom facilities <br />Jones' Pier <br />. Cottage to be painted & interior renovated in early <br />2021 <br />• House to be elevated (HMGP Grant received) in mid-. <br />2021. <br />• Museum layout & exhibit designs underway <br />• Bids for construction of parking lot, pavilion and trail <br />Parking lot and trail to be <br />Kroegel <br />have been received <br />opened in mid -2021 <br />Homestead <br />• Planning for reconstructed outbuildings in 2021 <br />• Museum design planned for FY21/22 <br />• Repaired impoundment overlook under construction <br />Boardwalk & trail improvements <br />Oslo Riverfront <br />New perimeter fencing planned for early 2021 <br />to be complete in late <br />• New boardwalks planned for 2021/22 <br />2021/early 2022 (pending <br />• Planning improvements to the ADA loop trail <br />design & permitting) <br />Oyster Bar <br />Construction of boardwalks 7 trails complete <br />Site improvements to be <br />Marsh <br />Parking lot construction anticipated to commence in <br />completed in mid -2021 <br />early 2021. <br />• Perimeter fending to be installed in early 2021 <br />Overlook to be completed in <br />Wabasso Scrub <br />Wetland overlook bidding nearing completion <br />mid -2021 <br />• Trails complete <br />Conservation Lands Program Update— Informational Item <br />January 202J <br />